Changes

Jump to: navigation, search

Enterprise Hyperscale Lab

557 bytes added, 10:47, 13 May 2015
Equipment Detail
After the fan units are installed, there are [http://en.wikipedia.org/wiki/Rack_unit 33u] available for other devices.
 
'''Cabinet 2'''
 
As of May 2015, the parts that would make up the second EHL cabinet has been temporarily assembled in storage for use with the AMD Seattle.
=== Power ===
The total draw of the EHL equipment installed in the first cabinet as of January 2015 was approximately 1.8 kWh under load. The current power system can support a little over 3 kWh; the cabinet supports thermal exchange of about 8 kWh.
 
'''Cabinet 2'''
 
Similarly to the first cabinet, power is provided by one APC 1.5kW rackmount power supply. The UPS then feeds one Raritan Dominion PDU. The configuration of these pieces are near mirrors of cabinet 1 and thus they have the same capability to remotely control and monitor the status of each piece of the network. The PDU for cabinet 2 currently is utilized only by the AMD Seattle.
=== Environmental Monitoring ===

Navigation menu