Changes

Jump to: navigation, search

Enterprise Hyperscale Lab

11 bytes removed, 17:29, 31 January 2015
Power
Devices which are not configured with dual PSUs are connected to just one of the PDUs.
The total draw of the EHL equipment installed as of January 2015 was approximately 1.8 kWh depending on workloadunder load. The power system can support 3 kWh; the cabinet supports thermal exchange of about 8 kWh.
=== Environmental Monitoring ===

Navigation menu