OSTEP Meeting 2013-07-17
OSTEP Team Meeting
Contents
Equipment Reorganization
Phase I:
- Arngales need eSATA (ctyler -> oatley)
- Monitoring: ???
- Oatley to decide direction and implement (2013-08-02)
- Update Pidora builder f18v6 chroot (oatley+fossjon+agreene) -> Update to ks-based environment
- Need for 2013-07-19 (URL: http://zenit.senecac.on.ca/wiki/index.php/Armv6hl_bootstrap)
- Upstream or figure out carry-forward plan for modified packages (ctyler)
- Wiki page posted (fossjon) (URL: http://zenit.senecac.on.ca/wiki/index.php/Armv6hl_bootstrap)
Pidora
ToDo
- SOPs
- Ansible SOP (oatley) (done)
- Pidora sign mash rsync SOP (oatley) (done)
- Sigul SOP (oatley)
- Koji-follow SOP (fossjon) (done?)
- Document chroot process SOP (v6 specific package changes) from blog (fossjon)
- Pidora repo sym link setup SOP (oatley)
- Pidora repo sym link double space rsync (oatley)
- In process (oatley)
- Need to schedule SOP tests (Aug/Sep)
- Build f19 + f18 updates is being built (agreene)
- Automate the vc-firmware packages (agreene)
Release status and feedback--
- Monitor trac
- Blog posts for pidora x2 each week
- Choose a day and start blogging together
- Schedule publishing to start Monday 2013-07-22 (ctyler)
Issue Tickets
- /etc/hostname file conflict? overriding sysconfig value? (agreene) (Possible solutions) (Ticket ###)
- modify firstboot to write hostname file
- delete file in post of kickstart
- Legality of a pidora miniDLNA package? where can we include it?
- agreene (Ticket ###)
- Camera support testing (agreene) (Ticket ###)
Building F18-updates, F19, Rawhide:
- f19 is building (agreene)
- agreene is buildmaster
- qt-webkit, gstreamer-bad-free, perl-crypt-ssl, and more! (done)
- start building by 2013-06-28
- F19 Timeframe - Need to look at package set issues
- Estimate by 2013-08-06 (agreene)
Infra Duties
- A pidora-team group email address so chris doesn't get all the complaints (place on pidora.ca) (ctyler -> fossjon 2013-07-17)
- Safe guarded sign/mash/rsync script for better automation and less manual user error (oatley)
- Needs testing of email (2013-07-19)
- A main site to post updates or feedback or announcements? (pidora.ca site && #pidora channel && blog)
- pidora irc not a OP can't change topic (get Dan to set auto-op on OSTEP team members)
- Post this info to forums
- Start a pidora mailing list? (<--- hold for now)
Pidora blog--
- Need 2 articles per person by EOW
Blog Posts
- Ask the community forums about what people might want to do?
- How to set a static ip networkmanager (fossjon) (done)
- How to install and use scratch
- How to make a basic python scrypt
- Use yumex for a graphical install
- Turn the raspberry pi into a media centre?
- Setup some servers, httpd, sshd, etc
- Configure firewall and selinux
- Changing XFCE theme or layout
Firstboot module changes -- jon
- Need to look at F19+ firstboot and i18n code in there (agreene 2013-08-06)
- ex usage: _("This is some text")
- check modules from upstream, add to our modules
Optimizations
- Needs folder reorg (oatley 2013-07-19)
Openstack
- x86_64 OpenStack setup
- packstack allinone on the iraq
- packstack nova compute to australia
- Stalled
- Reinstall fedora 18 on all computers
- Iraq reinstalled
- Australia needs to be redone
- Hold Japan for now
Calxeda Hardware
- Coming! Real Soon Now! Really!
Bluetooth Audio Project
- Automated RPi->Bluetooth Audio connection with sound file playback (ctyler 2013-07-19)
OpenStack on ARM
- While waiting for Calxeda hardware, experimenting with KVM on Cortex-A15 hardware (Arndale) (ctyler 2013-08-07)
- With Calxeda hardware, experiment with OpenStack Nova bare-metal (ctyler ????-??-??)
TeX Live
- Can build on Calxeda builders
- Needs chroot updates to 1.8.0+
- Needs hub updates to 1.8.0+
- Hold for Calxeda hardware
Priorities
- Jon: Happy trails! Keep the Internets running!
- Andrew Oatley-Willis: backups, repo config, builder updates, builder capacity; Flock talk
- Andrew Greene: Pidora builds
- Chris Tyler: Bluetooth audio, OpenStack; Flock talks
Schedule
- ctyler away: July 22-Aug 5
- Reachable July 22-26
- Unreachable July 26-Aug 5
- oatley and ctyler at Flock Aug 8-12
- End-of-summer closure: August 26-30
- Aug 5 is statutory holidays
- ctyler may work August 3/4/5 if Calxeda hardware is here
- oatley: ???
- agreene away: Aug ___ - ____