BTP300B A2 Team 7 Work Plan
Work Plan For A2 Release 0.1
- Yiqi (Team Leader)
- Implement the following methods:
- constructor and destructor
- setLine()
- capture()
- display()
- edit()
- draw()
- Ali Shoja
- Implement the following methods:
- the two row() methods
- the two col() methods
- the two height() methods
- the two width() methods
- move() x 2
- Tai Nguyen
- Implement the following methods:
- absrow()
- abscol()
- goMiddle()
- the two bordered() methods
- the two frame() methods
- hide()
Work Plan For A2 Release 0.2:
- Group:
- CField
- CDialog
- Tai Nguyen (Team Leader)
CLine
- Yiqi Liu
CLabel
- Ali Shoja
CButton