Changes

Jump to: navigation, search

Processing.js/ConferenceCalls/Apr-15-2010

243 bytes added, 16:54, 15 April 2010
Minutes
Corban: hsb support is in super-review, looked over constants in p5 and cleaned up constants, waiting for super-reviews. Corban will look at his tickets to see what should be moved because he is busy but will try to get keyboard support.
Dave: working on performance but it is a huge patch. Code needs to be at a stand still so that the patch can be properly done. Scott's with() removal patch is going into 0.9. Next week we will decide when to do that corban will help with this. Random Stuff: people who ported the code over from P5 are most likely not coming back. Possibility of assigning the tickets to Yuri (notmasteryet) and let him take a look.

Navigation menu