BTP300A Team 42 A2 Weekly Log
BTP300 Links
Contributions
Week 5
- 10/04 (Thursday) Pair Programming over Skype
- Methods were evenly split
- Added cross-platform functionality: hide cursor during frame movement
- 10/05 (Friday) Pair Programming in the Computer Lab
- Minimum requirements are met, all tests are completed; Assignment 2 Release 0.1 is ready for submission
- Started working on optimization (besides the cursor hiding)
- 10/06 (Saturday) Assignment 2 Release 0.1 is submitted
- Classes for R02 were evenly split (Kirill - CLabel/CButton, Petr - CField/Cline)
- 10/07 (Sunday) Assignment 2 Release 0.1 is Due
Study Week
- (Petr) Started coding CField
Week 8
- 10/29 (Kirill) Started working on my classes
- 10/30 Added Lu Liu in the team, gave him CButton class. CLabel and CField are done
- Petr working on cdialog
- Kirill will work on extra features
- 10/30 (Lu) reviewed previous codes and started to work on CButton class
Week 9
- 11/5 (Monday) Lu will work on CLine class also.
- Petr working on CDialog
- Kirill working on porting extra features from a1 to a2 format and modifying / optimizing as required
- 11/6 CButton is done. CDialog is done
- 11/8 CLine is done
- 11/9 Started debugging a2r2 over vsa
Week 10
- 11/12 a2r3 passes the a2 tests provided on vs and matrix.
- (Petr) worked on custom main application for a2r3
- (Kirill) worked on / debugged extra features
- (Lu) debugged CLine/CField/CButton classes further
- applies to rest of week
- 11/17 Encountered problem compiling with a2test on Borland platform (deprecated compiler).
- Worked on debugging for Borland compilation
Week 11
- 11/18 Borland issue tracked down (issue converting from bool* to bool in a2test.cpp)
- 11/19 A2 passes every test and custom main works successfully on every platform/
- A2 submitted