BTP300A Team 42 A2 Weekly Log
Revision as of 00:36, 5 October 2012 by Kirill Sochnev (talk | contribs)
BTP300 Links
Contributions
Week 5
- 10/04 (Thursday) Pair Programming over Skype
- Methods were evenly split
- Added cross-platform functionality: hide cursor during frame movement
- 10/05 (Friday) Pair Programming in the Computer Lab
- Minimum requirements are met, all tests are completed; Assignment 2 Release 0.1 is ready for submission
- Started working on optimization (besides the cursor hiding)
- 10/06 (Saturday) Assignment 2 Release 0.1 is submitted
- 10/07 (Sunday) Assignment 2 Release 0.1 is Due
Week 6
Week 7
- 10/21 (Sunday) Assignment 2 Release 0.2 is Due
Study Week
- 10/28 (Sunday) Assignment 2 Release 0.3 is Due