Difference between revisions of "BTP300A Team 42 A2 Weekly Log"
Line 14: | Line 14: | ||
==Week 5== | ==Week 5== | ||
− | *10/ | + | *10/04 (Thursday) Pair Programming over Skype |
**Methods were evenly split | **Methods were evenly split | ||
− | |||
**Added cross-platform functionality: hide cursor during frame movement | **Added cross-platform functionality: hide cursor during frame movement | ||
+ | *10/05 (Friday) Pair Programming in the Computer Lab | ||
+ | **Minimal requirements are met, all tests are completed; Assignment 2 Release 0.1 is ready for submission | ||
+ | **Started working on optimization (besides the cursor hiding) | ||
− | + | *10/06 (Saturday) Assignment 2 Release 0.1 is submitted | |
*10/07 (Sunday) Assignment 2 Release 0.1 is Due | *10/07 (Sunday) Assignment 2 Release 0.1 is Due | ||
Revision as of 23:29, 4 October 2012
BTP300 Links
Contributions
Week 5
- 10/04 (Thursday) Pair Programming over Skype
- Methods were evenly split
- Added cross-platform functionality: hide cursor during frame movement
- 10/05 (Friday) Pair Programming in the Computer Lab
- Minimal requirements are met, all tests are completed; Assignment 2 Release 0.1 is ready for submission
- Started working on optimization (besides the cursor hiding)
- 10/06 (Saturday) Assignment 2 Release 0.1 is submitted
- 10/07 (Sunday) Assignment 2 Release 0.1 is Due
Week 6
Week 7
- 10/21 (Sunday) Assignment 2 Release 0.2 is Due
Study Week