Difference between revisions of "BTP300 Team FUM"
Krushpachani (talk | contribs) (→TBA) |
Krushpachani (talk | contribs) (→Project Status) |
||
(One intermediate revision by the same user not shown) | |||
Line 30: | Line 30: | ||
== Project Status == | == Project Status == | ||
− | Assignment uploaded | + | Assignment 1 uploaded |
== Resources == | == Resources == |
Latest revision as of 12:13, 25 October 2011
BTP300 Fall 2011 | Weekly Schedule | Student List | Project Requirements | Teams and their Projects | Student Resources
TBA
Repository
Link to repository = svn://zenit.senecac.on.ca/btp300_113rep9
Repo ID
btp300_113rep9
Team Members:
Task Assigned:
- Michael Veis : CLabel
- Filza Tahir : CButton
- Umair Ali :
- Krush Pachani: CField
Trunk Status
committed by [Umair] / being committed by [NAME]
Project Status
Assignment 1 uploaded