Difference between revisions of "BTP300 Team FUM"
Krushpachani (talk | contribs) (→Trunk Status) |
Krushpachani (talk | contribs) (→Project Status) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 19: | Line 19: | ||
---- | ---- | ||
Task Assigned: | Task Assigned: | ||
− | # Michael Veis : | + | # Michael Veis : CLabel |
− | # Filza Tahir : | + | # Filza Tahir : CButton |
# Umair Ali : | # Umair Ali : | ||
− | # Krush Pachani: | + | # Krush Pachani: CField |
Line 30: | Line 30: | ||
== Project Status == | == Project Status == | ||
+ | Assignment 1 uploaded | ||
+ | |||
== Resources == | == Resources == |
Latest revision as of 12:13, 25 October 2011
BTP300 Fall 2011 | Weekly Schedule | Student List | Project Requirements | Teams and their Projects | Student Resources
TBA
Repository
Link to repository = svn://zenit.senecac.on.ca/btp300_113rep9
Repo ID
btp300_113rep9
Team Members:
Task Assigned:
- Michael Veis : CLabel
- Filza Tahir : CButton
- Umair Ali :
- Krush Pachani: CField
Trunk Status
committed by [Umair] / being committed by [NAME]
Project Status
Assignment 1 uploaded