Difference between revisions of "BTP300A Team 42 A2 Weekly Log"

From CDOT Wiki
Jump to: navigation, search
Line 23: Line 23:
 
*10/06 (Saturday) Assignment 2 Release 0.1 is submitted
 
*10/06 (Saturday) Assignment 2 Release 0.1 is submitted
 
*10/07 (Sunday) Assignment 2 Release 0.1 is Due
 
*10/07 (Sunday) Assignment 2 Release 0.1 is Due
 
==Week 6==
 
  
 
==Week 7==
 
==Week 7==

Revision as of 17:47, 10 October 2012

BTP300 Links

Contributions

Week 5

  • 10/04 (Thursday) Pair Programming over Skype
    • Methods were evenly split
    • Added cross-platform functionality: hide cursor during frame movement
  • 10/05 (Friday) Pair Programming in the Computer Lab
    • Minimum requirements are met, all tests are completed; Assignment 2 Release 0.1 is ready for submission
    • Started working on optimization (besides the cursor hiding)
  • 10/06 (Saturday) Assignment 2 Release 0.1 is submitted
  • 10/07 (Sunday) Assignment 2 Release 0.1 is Due

Week 7

  • 10/21 (Sunday) Assignment 2 Release 0.2 is Due

Study Week

  • 10/28 (Sunday) Assignment 2 Release 0.3 is Due