Changes

Jump to: navigation, search

Winter 2018 SPO600 Weekly Schedule

795 bytes added, 10:05, 21 March 2018
no edit summary
** Demand Loading
** Memory mapped files
 
=== Software Impact ===
* Alignment checks
* Page boundary crossing
 
=== Week 8 Delivarables ===
* Blog about your project
 
== Week 9 ==
 
=== Week 9 - Class I ===
==== Memory Barriers ====
* Memory encryption
=== = Building Software Impact ====* Configuration Systems** make-based systems*** The GNU Build System**** Autotools, Automake**** config.guess and config.sub*** CMake* Alignment checks** qmake*** Meson*** iMake and Others** Non-make-based systems*** Apache Ant*** Apache Maven*** Qt Build System* Building in the Source Tree vs. Building in a Parallel Tree** Pros and Cons* Installing and Testing in non-system directories** Configuring installation to a non-standard directory*** DESTDIR variable** Runtime environment variables:*** PATH*** LD_LIBRARY_PATH and LD_PRELOAD (see the [http://man7.org/linux/man-pages/man8/ld.so.8.html ld.so manpage]) === Weekk 9: Class II ===* Page boundary crossingTBA: Atomics/Intrinsics
=== Week 8 Delivarables 9 Deliverables ===
* Blog about your project
 
<!--

Navigation menu