1,016 bytes added, 20:27, 27 March 2015
5. Elsi Nushaj & Hyungryul Chun
* There is a lot of course work that is being piled on and it might be tough to keep up with the pre determined schedule. UI development is a little back tracked due to an assignment being due today, but Elsi will likely be back on track before the end of next week.
 
====Week 11 (March 27)====
* This week more UI work was done and is nearly entirely complete, aside from the BMI calculator screens. The timer visuals and function have been set up to receive the time from a user (Elsi). The random generator function was deferred to the following week as well as some of the DB entries. Facebook and youtube integration was researched a bit and some DB content was created (Steve).
 
* We have been a little back tracked due to a heavy course load from other courses and haven't been able to link up the DB aspect yet even though it is set up (Steve), but will be able to get back on track next week. Next week we plan on integrating the DB and trying to set up any of the two APIs (facebook and youtube).
 
* Similar to the other weeks the amount of course work and deadlines have made meeting the milestones a little more chaotic, but we are still getting work out and feel we are still on track. Other delays would likely be from the final projects remaining from other courses.