=== Milestone 3 - Release 0.3 ===
For this release I will focus on providing user interface / usabilityenhancements. I will also look to resolve any development bugs or unexpected results. ==== Requirements and Specifications ==== <pre> <tjduavis> i think i should resolve the login problem <dave> agreed. <dave> what else? <tjduavis> should i bother in getting the text element into a description element? <dave> yes, I think so <tjduavis> ok <tjduavis> the timestamp into local time? <dave> what do you think? <dave> I'm less concerned with that <tjduavis> right and i think thats above my powers as its tight up with the twitter api. the api is converting the time into utc <tjduavis> but i could be wrong. <tjduavis> how about this facebook service being down <tjduavis> i want it included but i honestly dont know where to start investigating <tjduavis> or that might set me back <dave> I think leave that <dave> it could very well be their side killing apis <dave> focus on the twitter stuff <dave> I agree about the date stuff, leave it <tjduavis> ok</pre> ==== Deliverable ==== Source Code:* The source code for release 0.3 can be found [http://matrix.senecac.on.ca/~tjduavis/dps909/coop-release0.3.zip here]* The svn patch for release 0.3 can be found [http://matrix.senecac.on.ca/~tjduavis/dps909/coop-release0.3-patch.txt here] Instructions for installing:* The [http://developer.mozilla.org/en/docs/Building_an_Extension#Test test method] is used for installation.
=== Resources ===
|-
|4.0 Milestone 0.2
|In ProgressComplete
|Oct 15, 2007
|Nov 12
|Nov 11, 2007
|-
|5.0 <del>Milestone 0.3</del>|In ProgressComplete
|Nov 12
|Dec 14|-||5.1 <del>Plan Milestone 0.3Deliverable</del>|Dec 3, 2007|Dec 3, 2007|-|||colspan="2"|5.1.1 <del>Gather requirements</del>|-||5.2 Implement Deliverable|Dec 3, 2007|Dec 12, 2007|-|||colspan="2"|5.2.1 <del>Perform implementation and unit testing</del>|-||5.3 Funtion Testing|Dec 8, 2007|Dec 14, 2007|-|||colspan="2"|5.2.1 <del>Perform function testing</del>
|}
#* Completed Milestone 2
#* Updated Milestone 2 with source code and patch.
# Updated Project Details - Dec 12, 2007
#* Updated Project Schedule
# Updated Project Details - Dec 15, 2007
#* Updated Project Schedule
#* Updated Project Details for Release 0.3