Changes

Jump to: navigation, search

BTP300B Team 6 Weekly Log

No change in size, 02:26, 9 October 2012
Week 3
==Week 3 ==
1024/2409/2012: Outlined an overall structure of the assignment and visualized how each function and member is connected to each other.1025/2509/2012: Wrote out the framework of the header and cpp files.
1025/2509/2012: Coded and completed the following functions: absrow, abscol, goMiddle and all of the fetch and set functions (bordered, frame, row, col, height and width)
1027/2709/2012: Rough outline of CFrame and setLine function was started
1028/2809/2012: CFrame and setLine functions finished.
1029/2909/2012: capture and draw functions started and finished
==Week 4 ==

Navigation menu