154 bytes added, 08:13, 7 November 2012
Andrew
== Andrew ==
=== Current ===* Arrange a visit to CloudDynamics for a tech demo.* Discuss the idea of weekly short conference calls to make sure we're on the right track. === Done ===* <s>Get at least two more boxes (better 3).</s> On order due week of the 12th of Nov.* <s>Talk to Jordan / Chris T. about Trac on monday or tuesday.* Get a KVM switch supporting at least two inputs (3 or 4 even better).</s>
* <s>Figure out the workspace network settings.</s>
* <s>Figure out whether a gigabit switch is necessary to support running VMs with the disk on another machine and figure out what it would cost.</s>
* <s>Obtain 8-port switch</s> and 8 cables. On order due week of the 12th of Nov.
* <s>Obtain a port-forwarding-capable NAT router.</s>
* Arrange a visit to CloudDynamics for a tech demo.* Discuss the idea of weekly short conference calls to make sure we're on the right track.* <s>Meet with David G. about project plan.</s>* <s>Ask about keys for cabinets</s> === Postponed === * Get a KVM switch supporting at least two inputs (3 or 4 even better).