Open main menu

CDOT Wiki β

Changes

Seneca-CD

28 bytes added, 11:03, 5 November 2012
Andrew
* Get at least two more boxes (better 3).
* Talk to Jordan / Chris T. about Trac on monday or tuesday.
* Get a KVM switch supporting at least two inputs (3 or 4 even better).
* <s>Figure out the workspace network settings.</s>* <s>Figure out whether a gigabit switch is necessary to support running VMs with the disk on another machine and figure out what it would cost.</s>* <s>Obtain 8-port switch </s> and 8 cables.* <s>Obtain a port-forwarding-capable NAT router.</s>
* Arrange a visit to CloudDynamics for a tech demo.
* Discuss the idea of weekly short conference calls to make sure we're on the right track.
* Meet with David G. about project plan.
* Talk to Jordan / Chris T. about Trac on monday or tuesday.