Open main menu

CDOT Wiki β

BTP300B A2 Team 7 Work Plan

Work Plan For A2 Release 0.1

  • Yiqi (Team Leader)
  1. Implement the following methods:
  2. constructor and destructor
  3. setLine()
  4. capture()
  5. display()
  6. edit()
  7. draw()


  • Ali Shoja
  1. Implement the following methods:
  2. the two row() methods
  3. the two col() methods
  4. the two height() methods
  5. the two width() methods
  6. move() x 2


  • Tai Nguyen
  1. Implement the following methods:
  2. absrow()
  3. abscol()
  4. goMiddle()
  5. the two bordered() methods
  6. the two frame() methods
  7. hide()


Work Plan For A2 Release 0.2:

  • Group:
  1. CField
  2. CDialog


  • Tai Nguyen (Team Leader)
CLine


  • Yiqi Liu
CLabel


  • Ali Shoja
CButton