Summer 2015 OSTEP Team Training
May 4
CDOT Orientation
- 10 AM - 2 PM including Lunch
DevOps
- Relocate to new location
- NE cubicle in T1034 cubicle cluster + Table
- Coin toss for table!
- Edwin: ?? - Existing PC
- Justin: ?? - Import PC
- Discussion of Summer 2015 Project
- Overview
- Initial projects: Infrastructure setup, server selection
- Schedule for the Week
LEAP
- Workspace setup
- LEAP: 4 cubicles in T1036 cubicle cluster + Table
- Andrew: SW - Existing PC
- Glaser: NE - Existing PC
- Artem: Table - Import PC
- Reinaldo: (SE Import/NW Existing)
- Michael: (SE Import/NW Existing)
- Computer setup
- Individual workstations
- Clean-up of storage and security on existing workstations
- SSH key generation for EHL
- Schedule for the Week
Tuesday, May 5
LEAP Intensive Training
- 9-12 - T1042
- RPM Overview
- Creating an RPM Package
- 2-5 - T1030
- Working with Mock
- Working with Koji
- Package Set Dependencies
DevOps Training
- 12:30-2:00 - T1030
- Project Overview
- Preparation
- Initial research directions
- VM setup and configuration
- On-site training/requirements gathering
Wednesday, May 6
LEAP Intensive Training
- Building, Releasing, and Maintaing a Distribution
- Signing
- Repos
- Repoclosure
- Composing
- Release Notes
- Boot process
- Anaconda
- Kickstart
- PXE
- uEFI
- Installation configuration
- Using the EHL
- Architecture
- VPN
- Gateway system
- System control - power, monitoring
Initial Tasks
- X-Gene PCIe tests - Artem
- Test new firmware for X-Gene
- ACPI tests
- PCIe SATA (AHA 71605H)
- Test LEAP installation process - Reinildo
- Package set defaults
- Comps (groups)
- Set up S1 - Michael
- Rewire and label EHL - Artem
- Plan
- Implement w/ minimal impact on operations
- Set up Red as the gateway for the EHL
- Sigul setup - Glaser
- Test LEAP operation in a variety of contexts
- Investigate 10G performance on X-Gene
- Build BB1 (LEAP 7.1)
- Current status
- Build forward
Next Tasks
- Get GUI working
- Get interactive installer working
To DiscussEquipment Needs
- LEAP Team
- 1 chair w/ adjustable arm height
- 2 pairs of LCD monitors
- 1 PC
- 1 Extension cord set
- 1 PSU 600W+
- Name sign & keys - Michael, Reinildo, Artem
- Need contracts - everyone!