This page will serve as a table of contents for the Seneca-CD CDOT research project.
People
- Diogo Monteiro and Kieran Sedgwick, supervised by Andrew Smith.
- Our timetables.
Blog
- http://senecacd.wordpress.com/
- TODO-Andrew: set up a backup in case wordpress.com is not 100% reliable
Bug Tracker
Plan for 2 weeks starting the 29th of October
Everyone
- Progress meeting tusday at 14:00
This week
Diogo
- Finish OpenNebula setup if there aren't any major problems.
- OpenStack - overview of what it is, then find what HA capabilities it has.
- CloudStack, same
- Linux-HA, same
- 1 Figure out what OpenNebula is capable of, how hard it is to set up, perhaps go through one setup.
Kieran
- Finish testing iSCSI target/initiator.
- Figure out what Citrix Xen server is, what's needed for us to set up our own as a reference point.
- 2 Read about iSCSI, check out OpenFiler, hopefully set it up, at least as a test if we don't yet have a dedicated box for the storage.
Diogo & Kieran - Done
-
Connect the two PCs into the local network. -
Test the local network speed, confirm it's close to Gbps. -
Verify that the two desktops we start with are working and capable of supporting virtualization. -
Verify two of the network sockets work, and what the IP/subnet/DNS numbers to use are. -
Get setup on the project blog, start posting on it. -
Download and set up the latest CentOS, confirm kvm/libvirt/virt-manager work.
Andrew
This week
- Ask Dawn about moving the mac somewhere else.
Done
-
Arrange a visit to CloudDynamics for a tech demo. -
Discuss the idea of weekly short conference calls to make sure we're on the right track. -
Ask Peter about writing on the wall. -
Print the network diagram. -
Get more network cables. -
Talk to Diana about paperwork. -
Get at least two more boxes (better 3).On order due week of the 12th of Nov. -
Talk to Jordan / Chris T. about Trac on monday or tuesday. -
Figure out the workspace network settings. -
Figure out whether a gigabit switch is necessary to support running VMs with the disk on another machine and figure out what it would cost. -
Obtain 8-port switchand 8 cables. On order due week of the 12th of Nov. -
Obtain a port-forwarding-capable NAT router. -
Meet with David G. about project plan. -
Ask about keys for cabinets
Postponed
- Get a KVM switch supporting at least two inputs (3 or 4 even better).