INTRODUCTION
Synopsis
oTTs, On-Time Timesheets, is an online system that allows Professors and Students to work collaboratively on System Design Projects. Seneca College's Computer Studies Department emphasizes strong team building skills, and achieves this through team projects. In the past, student and team progress have been monitored and maintained using conventional word processing documents. These conventional methods have proven to be difficult to synchronize between group members, and tended to lack substantial effort from those who were required to use them. oTTs creates an online environment where professors and students can work together to create and maintain personal timesheets and group project files. By allowing easy maintenance of projects and students for the professor, and simple manipulation functionality of timesheets and project files for students, oTTs takes the large task of project maintenance, and makes it simple for all of those involved.
Disclaimers
This project site and wikipedia are a student project only. Any opinions, statements or claims expressed here are those of the creators and are not necessarily those of Seneca College. Seneca College's Information Technology Acceptable Use Policy (ITAUP) can be found here.
INSTALLATION
System Requirements
In order to host oTTs, the system requirements are as follows:
- Internet Information Service (IIS)
- Web server such as warp.senecac.on.ca or hermes.senecac.on.ca
- Microsoft SQL Server
- ASP
- Compatible Browser (see Section 2.2 Browser Compatibility)
Browser Compatibility
oTTs strives to achieve a uniform appearance across all browsers and has been tested extensively on Firefox 2.0 and Internet Explorer 7. Either browser must have javascript enabled for full and proper functionality to work.
For the best performace, it is suggested that FireFox 2.0 is used, and the system be viewed in full screen mode.
Getting Started
Before you Begin
Make sure you have installed and met all system requirements listed in Section 2.1 System Requirements (link..?). This document will describe how to install oTTs assuming these requirements have been met.
Database Step Up
- Create a database in MS SQL using whichever database name you would like.
- Run the MS SQL script provided by oTTs, otts_schema.sql
Note: By default after the script has been executed, there will be a master adminstrator login in the database. It is recommended to use this login in order to create the initial adminstrator login before using the system. It is also highly recommended that the master administrtor login be deleted once another login has been created.
Master Adminstrator Login Information:
User ID: master_admin
Password: master_password
System Deployment
FUNCTIONALITY
Logging In
Passwords must be at least one character in length, and is case sensitive. It can contain numbers, letters, and most special characters with the exception of single quotation marks.
Administrator
The administrator is responsible for setting deadlines, creating accounts, and creating users.
Manage Projects
Manage Students
- when adding or updating a user, password is automatically regenerated and emailed
- A CSV file must contain the following fields in the following order separated by commas :
Last Name, First Name, Student ID, Project ID
for example we can have :
Doe, John, JDoe, bts630_071g01
Deadlines
The administrator can create any number of deadlines for the current semester.
Manage Semester
Summary
Student
Current Timesheet
Past Timesheets
Project File
The project file contains all the tasks that a group has completed or is going to complete. All tasks are broken in Summary Tasks that categorizes these tasks. For example, Create Tables might be one task in your Database category.
Time is broken into hours, and fractions if necessary. For example, 3.33 hours represents 3 hours and 20 minutes. Which you can get by calculating (time you spent in minutes)/60
Reminders
The calendar has coloured days for a quick analysis of future deadlines.
- Purple days represent deadlines that the entire team is responsible for
- Green days represent individual deadlines and timesheet deadlines