Team S - OOP344 20133

From CDOT Wiki
Revision as of 21:42, 19 October 2013 by Fabrizio Tomassi (talk | contribs) (meetings)
Jump to: navigation, search


OOP344 | Weekly Schedule | Student List | Teams | Project | Student Resources

Team S

Repository

Master Branch Status

Status

  • Open
    Open: you can merge now.
    Closed: Wait for the repo to get opened

Prototyping complete. Please pull changes.

Logs

  • DateTime, Merged/being Merged by full name, ircnick: mynick, any other info

Team Members

First Name Last Name Section Seneca Id wiki id IRC nick Blog URL
Andrew Daniele B adaniele1 Andrew Daniele adaniele87 Andrew's Blog
Fabrizio Tomassi C ftomassi Fabrizio Tomassi fabj2 Fabrizio's Blog
Jesse Conner B jgconner Jesse Glen Conner m_i_rite Jesse's Blog

Coding Style and Standards

Indentation

  • Do not use tab character
  • 4 spaces

Comments

  • comment above function definition (summarize function)
  • comment beside function declaration (very brief description)
  • comment complex code

Header Comments

/*
filename.cpp
OOP344x - Revision Number
Purpose: brief purpose of the class
Desc: brief description of project
Name: your full name - studentId
Modified: Month dd, yyyy
*/

Variable Naming

  • camel case with first letter lowercase in both variables and methods: int numCounter;
  • asterisk of a pointer will be attached to the type, not the variable name: int* pointer;
  • extern prefix: extern int _externInt;
  • static prefix: static int s_staticInt;

Code Blocks

  • all braces have their own line
if(condition)
{
    doSomething();
}
else
{
    doSomethingElse();
}

Tasks

Task Status Member(s) Description Done By Approx/Due
Code Cline Done Andrew Daniele Cline coding for R0.3 Sat Oct 19, 2013 20:00
Code CLabel In Progress Fabrizio Tomassi Complete CLabel methods for R0.3 Sun Oct 20, 2013 20:00
Split CDialog Pending All Split coding CDialog for R0.3 Wed Oct 23, 2013 23:00
Testing In Progress All Testing for R0.3 Thu Oct 24, 2013 23:00
Console code review In Progress All Console code review for R0.3 Thu Oct 24, 2013 23:00

Task History

meetings

Topic Description Date/Time
Introduction Discussed R02 and R03 Fri Oct 18, 2013 21:00
Discussed sub-tasks for R03 Cline and CLabel coding Sat Oct 19, 2013 13:00

Project Marking Percentage

Group work: 50
Individual work: 50
------------------------
Total 100%