Difference between revisions of "Team Q - OOP344 20133"

From CDOT Wiki
Jump to: navigation, search
(Team Name)
(Project Marking Percentage)
Line 4: Line 4:
 
* due right after study break
 
* due right after study break
 
<big>
 
<big>
  Group work:      XX%        (25 <= xx <= 50)
+
  Group work:      50%        (25 <= xx <= 50)
  Individual work: XX% +      (50 <= xx <= 75)  
+
  Individual work: 50% +      (50 <= xx <= 75)  
 
  -------------------------
 
  -------------------------
 
  Total          100%
 
  Total          100%
 
</big>
 
</big>
 +
 
== Repository ==
 
== Repository ==
 
* repo path:  
 
* repo path:  

Revision as of 16:28, 17 October 2013

Team Name

TEAM Q

Project Marking Percentage

  • due right after study break

Group work:      50%        (25 <= xx <= 50)
Individual work: 50% +      (50 <= xx <= 75) 
-------------------------
Total           100%

Repository

  • repo path:

Master Branch Status

Status

  • Open/Closed
    Open: you can merge now.
    Closed: Wait for the repo to get opened

Logs

  • DateTime, Merged/being Merged by full name, ircnick: mynick, any other info

Coding Style and Standards

  • No Tab Character allowed. (replace tabs with spaces)
  • Each object must have its own type:
int a;
int b;
CDialog D;

Team Members

Team Name (team x)
First Name Last Name Section Seneca Id wiki id IRC nick Blog URL
Alvaro Lemus C alemus4@myseneca.ca alemus4 alemus4 blog address Blogname

tasks

task name

  • task description
  • being done by team member name / not assigned
  • status


meetings

  • latest will be on top

topic, date

date