Difference between revisions of "Team Q - OOP344 20133"
Brad Clement (talk | contribs) (→Team Name) |
Brad Clement (talk | contribs) (→Project Marking Percentage) |
||
Line 4: | Line 4: | ||
* due right after study break | * due right after study break | ||
<big> | <big> | ||
− | Group work: | + | Group work: 50% (25 <= xx <= 50) |
− | Individual work: | + | Individual work: 50% + (50 <= xx <= 75) |
------------------------- | ------------------------- | ||
Total 100% | Total 100% | ||
</big> | </big> | ||
+ | |||
== Repository == | == Repository == | ||
* repo path: | * repo path: |
Revision as of 16:28, 17 October 2013
Contents
Team Name
TEAM Q
Project Marking Percentage
- due right after study break
Group work: 50% (25 <= xx <= 50) Individual work: 50% + (50 <= xx <= 75) ------------------------- Total 100%
Repository
- repo path:
Master Branch Status
Status
- Open/Closed
- Open: you can merge now.
- Closed: Wait for the repo to get opened
Logs
- DateTime, Merged/being Merged by full name, ircnick: mynick, any other info
Coding Style and Standards
- No Tab Character allowed. (replace tabs with spaces)
- Each object must have its own type:
int a;
int b;
CDialog D;
Team Members
First Name | Last Name | Section | Seneca Id | wiki id | IRC nick | Blog URL |
---|---|---|---|---|---|---|
Alvaro | Lemus | C | alemus4@myseneca.ca | alemus4 | alemus4 | blog address Blogname |
tasks
task name
- task description
- being done by team member name / not assigned
- status
meetings
- latest will be on top