Difference between revisions of "BBB BUC Emp ChgView"
Line 13: | Line 13: | ||
! Step# !! Actor !! System !! Data Used | ! Step# !! Actor !! System !! Data Used | ||
|- | |- | ||
− | | 1 || Chooses a view type (Calender or Grid) from the drop-down list || Displays the calender using the selected view type || | + | | 1 || Chooses a view type (Calender or Grid) from the drop-down list || Displays the calender using the selected view type || ALL (meeting_schedule)<br />ALL (meeting) |
|} | |} | ||
Revision as of 15:17, 14 June 2013
Brief Description: This Use Case enables the actor to switch between the Calendar and Gird view type.
Scenario 1: Change view type (Calendar/Grid)
Preconditions:
- The actor is logged into the system
- The actor is currently viewing the main page (calender.jsp) with a view type drop-down list, located on the upper right site of the webpage
Step# | Actor | System | Data Used |
---|---|---|---|
1 | Chooses a view type (Calender or Grid) from the drop-down list | Displays the calender using the selected view type | ALL (meeting_schedule) ALL (meeting) |
Successful Post Conditions:
- Calender's view is changed to desired type
- The system now displays the main site page (calender.jsp), with the new calender view