Difference between revisions of "GPU610/DPS915 Weekly Schedule 20123"

From CDOT Wiki
Jump to: navigation, search
(This Week)
(This Week)
Line 7: Line 7:
 
* [https://scs.senecac.on.ca/~gpu610/pages/content/intro.html Heterogeneous Computing]
 
* [https://scs.senecac.on.ca/~gpu610/pages/content/intro.html Heterogeneous Computing]
 
* [https://scs.senecac.on.ca/~gpu610/pages/content/ecosy.html The Eco-Systems]
 
* [https://scs.senecac.on.ca/~gpu610/pages/content/ecosy.html The Eco-Systems]
* [https://scs.senecac.on.ca/~gpu610/pages/content/intro.html The APOD Design Cycle]
+
* [https://scs.senecac.on.ca/~gpu610/pages/content/asses.html The APOD Design Cycle]
  
 
=== To Do ===
 
=== To Do ===

Revision as of 13:29, 6 July 2012


GPU610/DPS915 | Student List | Group and Project Index | Student Resources | Glossary

Weekly Schedule 20123

Week 1 - Sep 2

This Week

To Do

  1. Download Visual Studio 2010 from ACS and install it on your local computer.
  2. Download Tortoise SVN and install it on your local computer.
  3. Download the Introductory Sample from the Course Repository. (userid: "dpsgpu" password: blank [no password])
    • Compile and Run the sample
  4. Start Workshop 1 - Profile a Serial Application

Resources

Week 2 - Sep 9

This Week

To Do

Resources