'''2/09/2011 (Monday)'''
+
'''2/09/2011 (Mon)'''
 
* met with Jordan and Dawn to discuss about two projects that have been approved by NexJ
 
* met with Jordan and Dawn to discuss about two projects that have been approved by NexJ
  
'''2/11/2011 (Wednesday)'''
+
'''2/11/2011 (Wed)'''
 
* checked out Revision 28 from the code repository, ran PostgreSQLSchemaMangerTest and PostgreSQLAdapterTest
 
* checked out Revision 28 from the code repository, ran PostgreSQLSchemaMangerTest and PostgreSQLAdapterTest
 
* uploaded the JUnit testing results (the current status of the project)
 
* uploaded the JUnit testing results (the current status of the project)
  
 
== [[Common Problems and Solutions]] ==
 
== [[Common Problems and Solutions]] ==

Revision as of 15:08, 2 February 2011

Week 1

1/12/2011 (Wed)

  • NexJ project team meeting

1/15/2011 (Sat)

Week 2

1/18/2011 (Tue)

1/19/2011 (Wed)

1/20/2011 (TH)

  • NexJ Coding Standards received from Grace
  • Checkd out the code base of the PostgreSQLAdapter project from the mercurial repository
    • build errors encountered

Week 3

1/24/2011 (Mon)

  • ran the JUnit test PostgreSQLSchemaManagerTest on my laptop (vs the CDOT desktop)
    • errors encountered

1/25/2011 (Tue)

1/26/2011 (Wed)

1/27/2011 (Friday)

  • met with Grace to understand how he has used JUnit tests to guide his research and coding process

Week 4

2/09/2011 (Mon)

  • met with Jordan and Dawn to discuss about two projects that have been approved by NexJ

2/11/2011 (Wed)

  • checked out Revision 28 from the code repository, ran PostgreSQLSchemaMangerTest and PostgreSQLAdapterTest
  • uploaded the JUnit testing results (the current status of the project)