Difference between revisions of "CDOT Meeting 2011-01-13"

From CDOT Wiki
Jump to: navigation, search
(Staffing Needs - Summer 2011)
(Staffing Needs - Summer 2011)
Line 14: Line 14:
  
 
* 3D and Point Stream
 
* 3D and Point Stream
Andor - 1/2 shared (1/2 time)
+
**Andor - 1/2 shared (1/2 time)
2 Full Time 1-Point Stream; 1 - 3D (SceneCaster)
+
**2 Full Time 1-Point Stream; 1 - 3D (SceneCaster)
  
 
*Mozilla
 
*Mozilla
Input from Dave required.
+
**Input from Dave required.

Revision as of 17:10, 13 January 2011

Staffing Needs - Summer 2011

  • NexJ
    • current areas (Restful; SQL Lite; Hibernate: PostGreSQL
    • Summer - 3 FT positions
  • ARM
    • Build Master - 1 FT Potential to be a full year?
  • FeralSpace
    • Java programmers
    • 1 Position - Graphics and Programming
  • 3D and Point Stream
    • Andor - 1/2 shared (1/2 time)
    • 2 Full Time 1-Point Stream; 1 - 3D (SceneCaster)
  • Mozilla
    • Input from Dave required.