Difference between revisions of "Summer 2015 OSTEP Team Training"

From CDOT Wiki
Jump to: navigation, search
Line 4: Line 4:
 
* 10 AM - 2 PM including Lunch
 
* 10 AM - 2 PM including Lunch
  
=== OSTEP-DevOps ===
+
=== DevOps ===
 
* Relocate to new location
 
* Relocate to new location
 
* Discussion of Summer 2015 Project
 
* Discussion of Summer 2015 Project
  
=== LEAF ===
+
=== LEAP ===
 
* Workspace setup
 
* Workspace setup
 
* Computer setup
 
* Computer setup
Line 14: Line 14:
 
== Tuesday, May 5 ==
 
== Tuesday, May 5 ==
  
=== LEAF Intensive Training ===
+
=== LEAP Intensive Training ===
 
* RPM Overview
 
* RPM Overview
 
* Creating an RPM Package
 
* Creating an RPM Package
Line 23: Line 23:
 
== Wednesday, May 6 ==
 
== Wednesday, May 6 ==
  
=== LEAF Intensive Training ===
+
=== LEAP Intensive Training ===
 
* Building, Releasing, and Maintaing a Distribution
 
* Building, Releasing, and Maintaing a Distribution
 
** Signing
 
** Signing
Line 34: Line 34:
 
** Kickstart
 
** Kickstart
 
** PXE
 
** PXE
 +
** uEFI
 
** Installation configuration
 
** Installation configuration
 
* Using the EHL
 
* Using the EHL

Revision as of 21:08, 28 April 2015

May 4

CDOT Orientation

  • 10 AM - 2 PM including Lunch

DevOps

  • Relocate to new location
  • Discussion of Summer 2015 Project

LEAP

  • Workspace setup
  • Computer setup

Tuesday, May 5

LEAP Intensive Training

  • RPM Overview
  • Creating an RPM Package
  • Working with Mock
  • Working with Koji
  • Package Set Dependencies

Wednesday, May 6

LEAP Intensive Training

  • Building, Releasing, and Maintaing a Distribution
    • Signing
    • Repos
    • Repoclosure
    • Composing
    • Release Notes
  • Boot process
    • Anaconda
    • Kickstart
    • PXE
    • uEFI
    • Installation configuration
  • Using the EHL
    • Architecture
    • VPN
    • Gateway system
    • System control - power, monitoring

Initial Tasks

  • Test new firmware for X-Gene
  • Test LEAP installation process
  • Test LEAP operation in a variety of contexts
  • Test device support in LEAP
  • Investigate 10G performance on X-Gene
  • Set up Seattle (try LEAP on it?)
  • Set up a Seattle as the gateway for the EHL
  • Check repoclosure on aa2 and bb1 builds

Next Tasks

  • Do complete bb1 buildthrough to el7
  • Get GUI working
  • Get interactive installer working
  • Set up Sigul

To Discuss

  • Pidora
  • Flock 2015