Difference between revisions of "TDC- OOP344 20113"

From CDOT Wiki
Jump to: navigation, search
(The Dynamic Cast - OOP344 20113)
(The Dynamic Cast - OOP344 20113)
 
(15 intermediate revisions by 3 users not shown)
Line 9: Line 9:
  
 
*:Me and hardik working on CDialog - Nitesh Pradhan
 
*:Me and hardik working on CDialog - Nitesh Pradhan
 +
 +
*:I am working on CDialog - Hardik Sharma
 +
 +
*:I have finished doing CDialog - Hardik Sharma
  
 
*:I'm working on CCheckMark - Manpreet Narang
 
*:I'm working on CCheckMark - Manpreet Narang
  
 
*:Me and hardik working on CButton - Nitesh Pradhan
 
*:Me and hardik working on CButton - Nitesh Pradhan
 +
 
*:I am working on CButton - Hardik Sharma
 
*:I am working on CButton - Hardik Sharma
  
Line 28: Line 33:
  
 
*:I have done mnode For R0.6  - Haseeb ILyas
 
*:I have done mnode For R0.6  - Haseeb ILyas
 +
 +
*:I am working on CCheckList - Hardik Sharma
 +
 +
*:I finished CCheckList - Hardik Sharma
 +
 +
*:I am releasing R0.6 - Hardik Sharma
  
 
*:I have done Console Edit, Console Display, CLabel, CCheckark, Ctext and some others bug fixes for the whole project  - Manpreet Narang
 
*:I have done Console Edit, Console Display, CLabel, CCheckark, Ctext and some others bug fixes for the whole project  - Manpreet Narang
 +
 +
*:I did Console Edit, Console display, CField, CLineedit, CValedit, helped with Ctext and finished Cmenu - Rajbir Karan Singh
 +
 +
*:I have worked on Console Edit, Console Display, CDialog, CButton, CCheckList, updated CLabel and CButton for R0.3 - Hardik Sharma
 +
 +
*:I have worked on Console Edit, Console Display, CMenuItem, CMenu and updated CLabel- Haseeb Ilyas
 +
 +
*:Manpreet have performed an important role of Project Coordinator, Project Leader and Tester throughout the project. - Hardik Sharma
 +
  
 
== Project Marking Percentage ==
 
== Project Marking Percentage ==
Line 61: Line 81:
 
|-
 
|-
  
|[[User:hsharma10| Hardik]]|| Sharma|| B || [mailto:hsharma10@learn.senecac.on.ca?subject=oop344 hsharma10] || [[Special:Contributions/hsharma10 | hsharma10]] || hsharma10|| [I'll make one soon.]
+
|[[User:hsharma10| Hardik]]|| Sharma|| B || [mailto:hsharma10@learn.senecac.on.ca?subject=oop344 hsharma10] || [[Special:Contributions/hsharma10 | hsharma10]] || hsharma10|| [http://hardik-sharma-life.blogspot.com/2011/12/life.html My Blogs]
 
|-
 
|-
  
|[[User:nmpradhan| Nitesh]]|| Pradhan || B || [mailto:nmpradhan@learn.senecac.on.ca?subject=oop344 nmpradhan] || [[Special:Contributions/nmpradhan | nmpradhan]] || nmpradhan || [http://loadviewinanotherview.blogspot.com/2011/12/facebook-integration-all-feature-url-in.html/ Nitesh xcode + objective C Blog]
+
|[[User:nmpradhan| Nitesh]]|| Pradhan || B || [mailto:nmpradhan@learn.senecac.on.ca?subject=oop344 nmpradhan] || [[Special:Contributions/nmpradhan | nmpradhan]] || nmpradhan || [http://loadviewinanotherview.blogspot.com/ Nitesh xcode + objective C Blog]
 
|-
 
|-
  
Line 77: Line 97:
 
* status - Completed by Rajbir Karan Singh
 
* status - Completed by Rajbir Karan Singh
 
* finishing date : 011-12-2011
 
* finishing date : 011-12-2011
 +
 +
 +
* '''CCheckList'''
 +
* being done by - Hardik Sharma
 +
* finishing date : 012-12-2011
 +
* Status - Completed
  
  
Line 127: Line 153:
 
* being done by - Rajbir Karan Singh
 
* being done by - Rajbir Karan Singh
 
* status - DONE!!!
 
* status - DONE!!!
 +
 +
 +
* '''CDialog'''
 +
* Done by - Hardik Sharma
 +
* status - Finshed!!!
 +
* Finishing date : 26-10-2011
 +
 +
 +
* '''CButton'''
 +
* Done by - Hardik Sharma
 +
* status - Finshed!!!
 +
* Finishing date : 15-11-2011
  
  
Line 187: Line 225:
 
November 12
 
November 12
  
'''Karan Verma'''
+
'''Rajbir Karan Singh'''
  
 
ok done
 
ok done
Line 199: Line 237:
 
November 12
 
November 12
  
'''Karan Verma'''
+
'''Rajbir Karan Singh'''
 
can i do menu item?
 
can i do menu item?
  
Line 210: Line 248:
 
November 12
 
November 12
  
'''Karan Verma'''
+
'''Rajbir Karan Singh'''
 
ok then line edit i'll do
 
ok then line edit i'll do
  
Line 386: Line 424:
 
Sunday
 
Sunday
  
'''Karan Verma'''
+
'''Rajbir Karan Singh'''
  
 
I am done
 
I am done
Line 400: Line 438:
 
Sunday
 
Sunday
  
'''Karan Verma'''
+
'''Rajbir Karan Singh'''
  
 
krda peya
 
krda peya

Latest revision as of 14:50, 17 December 2011


OOP344 | Weekly Schedule | Student List | Teams | Project | Student Resources

The Dynamic Cast - OOP344 20113

  • I have also started working on CValEdit - Rajbir Karan Singh
  • I have just completed CLineEdit and realeased it under R0.033 - Rajbir Karan Singh
  • I am working on CLineEdit - Rajbir Karan Singh
  • Me and hardik working on CDialog - Nitesh Pradhan
  • I am working on CDialog - Hardik Sharma
  • I have finished doing CDialog - Hardik Sharma
  • I'm working on CCheckMark - Manpreet Narang
  • Me and hardik working on CButton - Nitesh Pradhan
  • I am working on CButton - Hardik Sharma
  • I am working on CMenuItem - Haseeb Ilyas
  • CMenuItem is Completed!!! - Haseeb Ilyas
  • I Updated CLabel and commit it in the Tagged CLabel Folder!!! - Haseeb Ilyas
  • Tagged CMenuItem - Haseeb Ilyas
  • I am working on CMenu For R0.6 - Haseeb Ilyas
  • I am working on mnode For R0.6 - Nitesh Pradhan
  • I have done mnode For R0.6 - Haseeb ILyas
  • I am working on CCheckList - Hardik Sharma
  • I finished CCheckList - Hardik Sharma
  • I am releasing R0.6 - Hardik Sharma
  • I have done Console Edit, Console Display, CLabel, CCheckark, Ctext and some others bug fixes for the whole project - Manpreet Narang
  • I did Console Edit, Console display, CField, CLineedit, CValedit, helped with Ctext and finished Cmenu - Rajbir Karan Singh
  • I have worked on Console Edit, Console Display, CDialog, CButton, CCheckList, updated CLabel and CButton for R0.3 - Hardik Sharma
  • I have worked on Console Edit, Console Display, CMenuItem, CMenu and updated CLabel- Haseeb Ilyas
  • Manpreet have performed an important role of Project Coordinator, Project Leader and Tester throughout the project. - Hardik Sharma


Project Marking Percentage

  • due right after study break

Group work:      50%        (25 <= xx <= 50)
Individual work: 50% +      (50 <= xx <= 75) 
-------------------------
Total           100%

Repository

  • Repo ID: 10

Trunk Status

  • Committed/Committing By:
    ID: emailid
    Name: full name
    IRC Nick: mynick
    Other Info:

Team Members

The Dynamic Cast - OOP344 20113
First Name Last Name Section Seneca Id wiki id IRC nick Blog URL
Manpreet Narang B msnarang msnarang msnarang Hak9
Haseeb Ilyas B hilyas hilyas hilyas Haseeb's Blog
Hardik Sharma B hsharma10 hsharma10 hsharma10 My Blogs
Nitesh Pradhan B nmpradhan nmpradhan nmpradhan Nitesh xcode + objective C Blog
Rajbir Karan Singh B rksingh14 rksingh14 rksingh14_ Apna Blog

Tasks

R0.6

  • CMenu
  • being done by - Haseeb Ilyas
  • status - Completed by Rajbir Karan Singh
  • finishing date : 011-12-2011


  • CCheckList
  • being done by - Hardik Sharma
  • finishing date : 012-12-2011
  • Status - Completed


  • CText
  • done by - Manpreet Narang
  • helped by - Rajbir Karan Singh
  • status - Completed


  • Fixed some bugs in others code
  • done by - Manpreet Narang

R0.3

  • CValEdit
  • being done by - Rajbir Karan Singh
  • status - Working!!!
  • Expected finishing date : 19-11-2011


  • CLineEdit
  • being done by - Rajbir Karan Singh
  • status - Finshed!!!
  • Finishing date : 18-11-2011


  • CMenuItem
  • being done by - Haseeb Ilyas
  • status - Done!!!
  • Implemented all Functions
  • Expected finishing date : 17-11-2011
  • finishing date : 17-11-2011


  • CCheckMark
  • being done by - Manpreet Narang
  • status - Done
  • Improving code
  • Expected finishing date : 17-11-2011


  • CLineEdit
  • being done by - Rajbir Karan Singh
  • status - Working!!!
  • Finished constructors
  • Expected finishing date : 16-11-2011


  • CField
  • being done by - Rajbir Karan Singh
  • status - DONE!!!


  • CDialog
  • Done by - Hardik Sharma
  • status - Finshed!!!
  • Finishing date : 26-10-2011


  • CButton
  • Done by - Hardik Sharma
  • status - Finshed!!!
  • Finishing date : 15-11-2011


  • CLabel
  • being done by - Manpreet Narang
  • status - DONE!!!
  • Update By Haseeb ILyas

Meetings

  • latest will be on top

topic, date

date

Manpreet Singh Narang

Hello,

Just wanted to know who is doing what for OOP project...?

November 12

Manpreet Singh Narang

I have fixed the R0.2.. there is just one more problem

When we complile the trunk with Test2

it works fine

ut when we hit escape key to

but*

exit the test application it crashes

I will have a look at it tomorrow morning

and let you know

November 12

Manpreet Singh Narang

Here's how we are working on the project: Hardik and Nitesh-ccheckbox,cmenu,cbutton Me-ccheckmark Rajbir nd Haseeb please provide some input here..

November 12

Rajbir Karan Singh which one is left?

November 12

Manpreet Singh Narang

cmenuitem i think

November 12

Rajbir Karan Singh

ok done

November 12

Manpreet Singh Narang

clineedit nd cvaledit

November 12

Rajbir Karan Singh can i do menu item?

November 12 Manpreet Singh Narang

menu te menuitem iko cheez aa shayad

November 12

Rajbir Karan Singh ok then line edit i'll do

November 12

Manpreet Singh Narang

ok perfect

Haseeb, please update us asap.

November 12

Manpreet Singh Narang

@Karan: i will do cvaledit if we didn't get nything back from Haseeb and will kick him out of the group.

Monday

Haseeb Ilyas

Guyz im working on CMenuItem Sorry For Late Response My Internet was not working at home so thats why i was not able to reply.

Monday

Manpreet Singh Narang

k

Yesterday

Hardik Sharma

I'll finish cbutton soon is there anything else for me to do????

Yesterday Manpreet Singh Narang

make sure cbutton is in compiled state.

Yesterday

Hardik Sharma

I think there is some problem in cframe b'coz cbutton and clabel doesn't have frame even if v pass bordered as true....

Yesterday

Manpreet Singh Narang

I think CFrame was written by Fardad

Yesterday

Hardik Sharma

i know but try having frame around ur clabel or my cbutton

Yesterday

Manpreet Singh Narang

are you passing the pattern string?

Yesterday

Hardik Sharma

no i m trying to use the default pattern

Yesterday

Manpreet Singh Narang

ok

it should work then

Yesterday

Hardik Sharma

ya tell me if find something

Yesterday

Manpreet Singh Narang

I will have a look

19 hours ago

Manpreet Singh Narang

Is there anyone having problem with the Linker?

20 minutes ago

Manpreet Singh Narang CDialog destructor fixed

CDialog's edit function improved

Get the new version of R00.

R0.3 which is R0.32

R0.3 which is R0.32

Please don't add cio and sql file to the repo...keep it on your local copy


Thursday

Manpreet Singh Narang

Gents,

You have to tell me today if you have any problem with the OOP project.

Don't ping me tomorrow at 8'o clock to say say that I'm struck on this function

I have uploaded my part..

Friday

Manpreet Singh Narang

How far we are from the release....?

Friday

Manpreet Singh Narang

Haseeb, Cmenu needs some fixes can u give me ur number?

Saturday

Haseeb Ilyas

9052350110 is the number but i only available with this numbere on saturday and sunday

Waths need to fix in CMenu

Saturday

Manpreet Singh Narang

Haseeb, are u available to talk for a while

?

Sunday

Manpreet Singh Narang

Haseeb CMenuItem should work with the new CLabel

we have to change code of our CLabel.

Check CMenuItem to updated CLabel

Hardik, Nitesh where are u guys..?

Sunday

Manpreet Singh Narang

Karan, are u wrking on cvalwdit??

Sunday

Rajbir Karan Singh

I am done

Sunday

Manpreet Singh Narang

did u tagged cvaledit?

Haseeb, u r the only one left

Sunday

Rajbir Karan Singh

krda peya

Sunday

Manpreet Singh Narang

ok gr8

Sunday

Haseeb Ilyas

Guyz I have Updated CLabel and Tagged it Make sure ur Classes work with Updated Cllabel and I tagged CMenuItem as well its in working state!!!