Difference between revisions of "EHL Infrastructure Upgrades"

From CDOT Wiki
Jump to: navigation, search
(Upgrades)
(Synology Rackstation)
 
Line 43: Line 43:
 
==Synology Rackstation==
 
==Synology Rackstation==
  
* Storage: 1 TB SSD x12
+
* Physical Storage: 1 TB SSD x12
 
* RAM: 24 GB
 
* RAM: 24 GB
 +
 +
===Storage Configuration===
 +
{| class="wikitable sortable" border="1" cellpadding="3" cellspacing="0"
 +
!Volume!!RAID Level!!Allocated Drives!!Total Space
 +
|-
 +
|System OS||1||1,2||934 GB
 +
|-
 +
|Leap and Pidora||6||3-12||2.4 TB
 +
|-
 +
|Backups||6||3-12||4.9 TB
 +
|}
  
 
===Upgrades===
 
===Upgrades===

Latest revision as of 12:46, 12 March 2018

This page contains planned upgrades, maintenance, and repairs on the Enterprise Hyperscale Lab and its associated infrastructure.

X-Gene Blue (replacing Red)

  • Firmware: apm 3.06.25
  • OS: 4.15.6-300.fc27.aarch64
  • Storage: 500 GB SSD
  • RAM: 8GB
  • Serial: 1

Upgrades

  • Increase RAM to 16 GB

Services to Install/Setup

Service Critical EHL Internal CDOT Network Internet Status
Gateway * Complete
DHCP * Complete
DNS * Complete
Firewall/NAT * Complete
PXE OS Install * Complete
VPN
Ansible
CDOT Wiki
LEAPproject.ca
Pidora.ca
Serial/PDU control * Complete
Fedora/CentOS Mirror Services

Synology Rackstation

  • Physical Storage: 1 TB SSD x12
  • RAM: 24 GB

Storage Configuration

Volume RAID Level Allocated Drives Total Space
System OS 1 1,2 934 GB
Leap and Pidora 6 3-12 2.4 TB
Backups 6 3-12 4.9 TB

Upgrades

  • Change storage setup and allocation (RAID 6) - Complete

Services to Install/Setup

Service Critical EHL Internal CDOT Network Internet
Backup NAS *
Fedora 27 x86_64 Mirror
Fedora 27 Aarch64 Mirror *
CentOS 7 x86_64 Mirror
CentOS 7 Aarch64 Mirror

Note: Mirror refers to data storage and will act as a NAS target via Blue.

Cyclades Terminal Server

  • Firmware: 2.6.11

Upgrades

  • Firmware update to 3.0.0-1

APC UPS - Cabinet 1, Upper Device

Repairs

  • Battery pack dead, needs replacement

General Maintenance

  • EHL cabinet fans must be cleaned
  • X-Genes should be reallocated between both cabinets for better power consumption/heat dissipation
  • Improved cable labelling
  • Power fail-over testing