Difference between revisions of "Summer 2015 OSTEP Team Training"
Chris Tyler (talk | contribs) (→Tuesday, May 5) |
Chris Tyler (talk | contribs) (→Equipment Needs) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 13: | Line 13: | ||
** Overview | ** Overview | ||
** Initial projects: Infrastructure setup, server selection | ** Initial projects: Infrastructure setup, server selection | ||
+ | * Schedule for the Week | ||
=== LEAP === | === LEAP === | ||
Line 26: | Line 27: | ||
** Clean-up of storage and security on existing workstations | ** Clean-up of storage and security on existing workstations | ||
** SSH key generation for EHL | ** SSH key generation for EHL | ||
+ | * Schedule for the Week | ||
== Tuesday, May 5 == | == Tuesday, May 5 == | ||
Line 69: | Line 71: | ||
== Initial Tasks == | == Initial Tasks == | ||
− | * Test new firmware for X-Gene | + | * X-Gene PCIe tests - Artem |
− | * Test LEAP installation process | + | ** Test new firmware for X-Gene |
+ | ** ACPI tests | ||
+ | ** PCIe SATA (AHA 71605H) | ||
+ | * Test LEAP installation process - Reinildo | ||
+ | ** Package set defaults | ||
+ | ** Comps (groups) | ||
+ | * Set up S1 - Michael | ||
+ | ** Test w/ LEAP | ||
+ | * Rewire and label EHL - Artem | ||
+ | ** Plan | ||
+ | ** Implement w/ minimal impact on operations | ||
+ | ** Set up Red as the gateway for the EHL | ||
+ | * Sigul setup - Glaser | ||
+ | |||
* Test LEAP operation in a variety of contexts | * Test LEAP operation in a variety of contexts | ||
− | |||
* Investigate 10G performance on X-Gene | * Investigate 10G performance on X-Gene | ||
− | * | + | * Build BB1 (LEAP 7.1) |
− | * | + | ** Current status |
− | * | + | ** Build forward |
== Next Tasks == | == Next Tasks == | ||
− | |||
* Get GUI working | * Get GUI working | ||
* Get interactive installer working | * Get interactive installer working | ||
− | |||
== To Discuss == | == To Discuss == | ||
Line 91: | Line 103: | ||
== Equipment Needs == | == Equipment Needs == | ||
− | * | + | |
− | ** | + | * LEAP Team |
− | ** | + | ** 1 chair w/ adjustable arm height |
− | ** | + | ** 2 pairs of LCD monitors |
− | ** | + | ** 1 PC |
− | ** | + | ** 1 Extension cord set |
− | * | + | ** 1 PSU 600W+ |
− | * | + | ** Name sign & keys - Michael, Reinildo, Artem |
− | ** Need | + | ** Need contracts - everyone! |
Latest revision as of 12:43, 6 May 2015
Contents
May 4
CDOT Orientation
- 10 AM - 2 PM including Lunch
DevOps
- Relocate to new location
- NE cubicle in T1034 cubicle cluster + Table
- Coin toss for table!
- Edwin: ?? - Existing PC
- Justin: ?? - Import PC
- NE cubicle in T1034 cubicle cluster + Table
- Discussion of Summer 2015 Project
- Overview
- Initial projects: Infrastructure setup, server selection
- Schedule for the Week
LEAP
- Workspace setup
- LEAP: 4 cubicles in T1036 cubicle cluster + Table
- Andrew: SW - Existing PC
- Glaser: NE - Existing PC
- Artem: Table - Import PC
- Reinaldo: (SE Import/NW Existing)
- Michael: (SE Import/NW Existing)
- LEAP: 4 cubicles in T1036 cubicle cluster + Table
- Computer setup
- Individual workstations
- Clean-up of storage and security on existing workstations
- SSH key generation for EHL
- Schedule for the Week
Tuesday, May 5
LEAP Intensive Training
- 9-12 - T1042
- RPM Overview
- Creating an RPM Package
- 2-5 - T1030
- Working with Mock
- Working with Koji
- Package Set Dependencies
DevOps Training
- 12:30-2:00 - T1030
- Project Overview
- Preparation
- Initial research directions
- VM setup and configuration
- On-site training/requirements gathering
Wednesday, May 6
LEAP Intensive Training
- Building, Releasing, and Maintaing a Distribution
- Signing
- Repos
- Repoclosure
- Composing
- Release Notes
- Boot process
- Anaconda
- Kickstart
- PXE
- uEFI
- Installation configuration
- Using the EHL
- Architecture
- VPN
- Gateway system
- System control - power, monitoring
Initial Tasks
- X-Gene PCIe tests - Artem
- Test new firmware for X-Gene
- ACPI tests
- PCIe SATA (AHA 71605H)
- Test LEAP installation process - Reinildo
- Package set defaults
- Comps (groups)
- Set up S1 - Michael
- Test w/ LEAP
- Rewire and label EHL - Artem
- Plan
- Implement w/ minimal impact on operations
- Set up Red as the gateway for the EHL
- Sigul setup - Glaser
- Test LEAP operation in a variety of contexts
- Investigate 10G performance on X-Gene
- Build BB1 (LEAP 7.1)
- Current status
- Build forward
Next Tasks
- Get GUI working
- Get interactive installer working
To Discuss
- Pidora
- Flock 2015
Equipment Needs
- LEAP Team
- 1 chair w/ adjustable arm height
- 2 pairs of LCD monitors
- 1 PC
- 1 Extension cord set
- 1 PSU 600W+
- Name sign & keys - Michael, Reinildo, Artem
- Need contracts - everyone!