(Created page with '== May 4 == === CDOT Orientation === * 10 AM - 2 PM including Lunch === OSTEP-DevOps === * Relocate to new location * Discussion of Summer 2015 Project === LEAF === * Workspac…')
 
(Equipment Needs)
 
(14 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
* 10 AM - 2 PM including Lunch
 
* 10 AM - 2 PM including Lunch
  
=== OSTEP-DevOps ===
+
=== DevOps ===
 
* Relocate to new location
 
* Relocate to new location
 +
** NE cubicle in T1034 cubicle cluster + Table
 +
*** Coin toss for table!
 +
*** Edwin: ?? - Existing PC
 +
*** Justin: ?? - Import PC
 
* Discussion of Summer 2015 Project
 
* Discussion of Summer 2015 Project
 +
** Overview
 +
** Initial projects: Infrastructure setup, server selection
 +
* Schedule for the Week
  
=== LEAF ===
+
=== LEAP ===
 
* Workspace setup
 
* Workspace setup
 +
** LEAP: 4 cubicles in T1036 cubicle cluster + Table
 +
*** Andrew: SW - Existing PC
 +
*** Glaser: NE - Existing PC
 +
*** Artem: Table - Import PC
 +
*** Reinaldo: (SE Import/NW Existing)
 +
*** Michael: (SE Import/NW Existing)
 
* Computer setup
 
* Computer setup
 +
** Individual workstations
 +
** Clean-up of storage and security on existing workstations
 +
** SSH key generation for EHL
 +
* Schedule for the Week
  
 
== Tuesday, May 5 ==
 
== Tuesday, May 5 ==
  
=== LEAF Intensive Training ===
+
=== LEAP Intensive Training ===
* RPM Overview
+
* 9-12 - T1042
* Creating an RPM Package
+
** RPM Overview
* Working with Mock
+
** Creating an RPM Package
* Working with Koji
+
* 2-5 - T1030
* Package Set Dependencies
+
** Working with Mock
 +
** Working with Koji
 +
** Package Set Dependencies
 +
 
 +
=== DevOps Training ===
 +
* 12:30-2:00 - T1030
 +
** Project Overview
 +
** Preparation
 +
*** Initial research directions
 +
*** VM setup and configuration
 +
** On-site training/requirements gathering
  
 
== Wednesday, May 6 ==
 
== Wednesday, May 6 ==
  
=== LEAF Intensive Training ===
+
=== LEAP Intensive Training ===
 
* Building, Releasing, and Maintaing a Distribution
 
* Building, Releasing, and Maintaing a Distribution
 
** Signing
 
** Signing
Line 34: Line 61:
 
** Kickstart
 
** Kickstart
 
** PXE
 
** PXE
 +
** uEFI
 
** Installation configuration
 
** Installation configuration
 
* Using the EHL
 
* Using the EHL
Line 40: Line 68:
 
** Gateway system
 
** Gateway system
 
** System control - power, monitoring
 
** System control - power, monitoring
 +
 +
== Initial Tasks ==
 +
 +
* X-Gene PCIe tests - Artem
 +
** Test new firmware for X-Gene
 +
** ACPI tests
 +
** PCIe SATA (AHA 71605H)
 +
* Test LEAP installation process - Reinildo
 +
** Package set defaults
 +
** Comps (groups)
 +
* Set up S1 - Michael
 +
** Test w/ LEAP
 +
* Rewire and label EHL - Artem
 +
** Plan
 +
** Implement w/ minimal impact on operations
 +
** Set up Red as the gateway for the EHL
 +
* Sigul setup - Glaser
 +
 +
* Test LEAP operation in a variety of contexts
 +
* Investigate 10G performance on X-Gene
 +
* Build BB1 (LEAP 7.1)
 +
** Current status
 +
** Build forward
 +
 +
== Next Tasks ==
 +
 +
* Get GUI working
 +
* Get interactive installer working
 +
 +
== To Discuss ==
 +
 +
* Pidora
 +
* Flock 2015
 +
 +
== Equipment Needs ==
 +
 +
* LEAP Team
 +
** 1 chair w/ adjustable arm height
 +
** 2 pairs of LCD monitors
 +
** 1 PC
 +
** 1 Extension cord set
 +
** 1 PSU 600W+
 +
** Name sign & keys - Michael, Reinildo, Artem
 +
** Need contracts - everyone!

Latest revision as of 13:43, 6 May 2015

May 4

CDOT Orientation

  • 10 AM - 2 PM including Lunch

DevOps

  • Relocate to new location
    • NE cubicle in T1034 cubicle cluster + Table
      • Coin toss for table!
      • Edwin: ?? - Existing PC
      • Justin: ?? - Import PC
  • Discussion of Summer 2015 Project
    • Overview
    • Initial projects: Infrastructure setup, server selection
  • Schedule for the Week

LEAP

  • Workspace setup
    • LEAP: 4 cubicles in T1036 cubicle cluster + Table
      • Andrew: SW - Existing PC
      • Glaser: NE - Existing PC
      • Artem: Table - Import PC
      • Reinaldo: (SE Import/NW Existing)
      • Michael: (SE Import/NW Existing)
  • Computer setup
    • Individual workstations
    • Clean-up of storage and security on existing workstations
    • SSH key generation for EHL
  • Schedule for the Week

Tuesday, May 5

LEAP Intensive Training

  • 9-12 - T1042
    • RPM Overview
    • Creating an RPM Package
  • 2-5 - T1030
    • Working with Mock
    • Working with Koji
    • Package Set Dependencies

DevOps Training

  • 12:30-2:00 - T1030
    • Project Overview
    • Preparation
      • Initial research directions
      • VM setup and configuration
    • On-site training/requirements gathering

Wednesday, May 6

LEAP Intensive Training

  • Building, Releasing, and Maintaing a Distribution
    • Signing
    • Repos
    • Repoclosure
    • Composing
    • Release Notes
  • Boot process
    • Anaconda
    • Kickstart
    • PXE
    • uEFI
    • Installation configuration
  • Using the EHL
    • Architecture
    • VPN
    • Gateway system
    • System control - power, monitoring

Initial Tasks

  • X-Gene PCIe tests - Artem
    • Test new firmware for X-Gene
    • ACPI tests
    • PCIe SATA (AHA 71605H)
  • Test LEAP installation process - Reinildo
    • Package set defaults
    • Comps (groups)
  • Set up S1 - Michael
    • Test w/ LEAP
  • Rewire and label EHL - Artem
    • Plan
    • Implement w/ minimal impact on operations
    • Set up Red as the gateway for the EHL
  • Sigul setup - Glaser
  • Test LEAP operation in a variety of contexts
  • Investigate 10G performance on X-Gene
  • Build BB1 (LEAP 7.1)
    • Current status
    • Build forward

Next Tasks

  • Get GUI working
  • Get interactive installer working

To Discuss

  • Pidora
  • Flock 2015

Equipment Needs

  • LEAP Team
    • 1 chair w/ adjustable arm height
    • 2 pairs of LCD monitors
    • 1 PC
    • 1 Extension cord set
    • 1 PSU 600W+
    • Name sign & keys - Michael, Reinildo, Artem
    • Need contracts - everyone!