1
edit
Changes
Created page with ' Category:OSTEP Meeting <!-- Prior meeting notes available at http://zenit.senecac.on.ca/wiki/index.php/Category:OSTEP_Meeting Sample meeting page address http://zenit.seneā¦'
[[Category:OSTEP Meeting]]
<!-- Prior meeting notes available at http://zenit.senecac.on.ca/wiki/index.php/Category:OSTEP_Meeting
Sample meeting page address http://zenit.senecac.on.ca/wiki/index.php/OSTEP_Meeting_2013-06-18 -->
OSTEP Team Meeting 2013-06-18
== Equipment Reorganization ==
Phase I:
* Done (mostly!) - Thanks Oatley
* Yosemite disk imaging
* Trimslice network setup
* Arndales need setup
* --> Builders available: 2013-06-21 (oatley)
Future (For 2013-06-30):
* Update Pidora builder chroot (oatley+fossjon+agreene) -> Update to ks-based environment
* Document!
* Upstream or figure out carry-forward plan for modified packages (for 2013-07-15)
* Slides + Icon
* Goal: ship NOOBS update by 4:30 today.
== Pidora ==
Release status and feedback--
* NOOBS update
** Image for NOOBS distribution will be done this afternoon
** Image for non-NOOBS distribution requires rootfs-resize update to handle extended partitions
Building F18-updates, F19, Rawhide:
* agreene is buildmaster
* start building by 2013-06-28
Pidora blog--
* Need 2 articles per person by EOW (2013-06-21)
Firmware/kernel updates
* Perhaps update daily / automatically into updates-testing, and promote only periodically? (agreene for 2013-06-28)
Russian respin--
* Need i18n for firstboot: http://docs.python.org/2/library/gettext.html (fossjon for 2013-06-28)
** ex usage: _("This is some text")
** check modules from upstream, add to our modules
Build Tags
* Remove "candidate" from tag heirarchy for building (agreene w/ oatley for 2013-06-21)
* Add %{rpfr} macros (agreene for 2013-06-21)
* This will solve the %{dist} tag issues!
Optimizations
* No longer mash the f18 repos (agreene by 2013-06-28)
* No longer rsync the f18 repos (oatley by 2013-06-28)
* Possible to optimize the signing? (oatley to check)
== Openstack ==
* x86_64 OpenStack setup (fossjon 2013-07-05)
** Moving Iraq to room, set up as dashboard/controller/NAT
** Australia as builder
== Calxeda Hardware ==
* Still ONE STINKIN' REFERENCE NUMBER AWAY FROM ORDERING!!!
=== Schedule ===
* ctyler away: June 24-28, July 22-Aug 5
* oatley and ctyler at Flock Aug 8-12
* ctyler to find out about end-of-summer schedule
* July 1 & Aug 5 are statutory holidays
* oatley and agreene may take vacation in August