|
|
(11 intermediate revisions by the same user not shown) |
Line 4: |
Line 4: |
| | | |
| * Diogo Monteiro and Kieran Sedgwick, supervised by Andrew Smith. | | * Diogo Monteiro and Kieran Sedgwick, supervised by Andrew Smith. |
| + | * Our [[Seneca-CD-Timetables | timetables]]. |
| | | |
| = Blog = | | = Blog = |
Line 9: |
Line 10: |
| * http://senecacd.wordpress.com/ | | * http://senecacd.wordpress.com/ |
| * TODO-Andrew: set up a backup in case wordpress.com is not 100% reliable | | * TODO-Andrew: set up a backup in case wordpress.com is not 100% reliable |
− |
| |
− | = Bug Tracker =
| |
− |
| |
− | * Waiting to hear back from Jordan about a stable Trac setup
| |
− | * Maybe this will be it: http://rome.proximity.on.ca/projects/senecacd
| |
− |
| |
− | = Plan for 2 weeks starting the 29th of October =
| |
− |
| |
− | == Everyone ==
| |
− |
| |
− | * Progress meeting tusday at 14:00
| |
− |
| |
− | == Diogo and Kieran ==
| |
− |
| |
− | === This week ===
| |
− |
| |
− | * Figure out what OpenNebula is capable of, how hard it is to set up, perhaps go through one setup.
| |
− | * Read about iSCSI, check out OpenFiler, hopefully set it up, at least as a test if we don't yet have a dedicated box for the storage.
| |
− | * Test the local network speed, confirm it's close to Gbps.
| |
− | * <s>Connect the two PCs into the local network.</s>
| |
− |
| |
− | === Done ===
| |
− |
| |
− | * <s>Verify that the two desktops we start with are working and capable of supporting virtualization.</s>
| |
− | * <s>Verify two of the network sockets work, and what the IP/subnet/DNS numbers to use are.</s>
| |
− | * <s>Get setup on the project blog, start posting on it.</s>
| |
− | * <s>Download and set up the latest CentOS, confirm kvm/libvirt/virt-manager work.</s>
| |
− |
| |
− | == Andrew ==
| |
− |
| |
− | === This week ===
| |
− | * Arrange a visit to CloudDynamics for a tech demo.
| |
− | * Discuss the idea of weekly short conference calls to make sure we're on the right track.
| |
− | * Ask Peter about writing on the wall.
| |
− | * Print the network diagram.
| |
− | * Ask Dawn about moving the mac somewhere else.
| |
− | * <s>Get more network cables.</s>
| |
− | * <s>Talk to Diana about paperwork.</s>
| |
− |
| |
− | === Done ===
| |
− | * <s>Get at least two more boxes (better 3).</s> On order due week of the 12th of Nov.
| |
− | * <s>Talk to Jordan / Chris T. about Trac on monday or tuesday.</s>
| |
− | * <s>Figure out the workspace network settings.</s>
| |
− | * <s>Figure out whether a gigabit switch is necessary to support running VMs with the disk on another machine and figure out what it would cost.</s>
| |
− | * <s>Obtain 8-port switch</s> and 8 cables. On order due week of the 12th of Nov.
| |
− | * <s>Obtain a port-forwarding-capable NAT router.</s>
| |
− | * <s>Meet with David G. about project plan.</s>
| |
− | * <s>Ask about keys for cabinets</s>
| |
− |
| |
− | === Postponed ===
| |
− |
| |
− | * Get a KVM switch supporting at least two inputs (3 or 4 even better).
| |