Changes

Jump to: navigation, search

Seneca-CD

1,816 bytes removed, 15:27, 11 February 2013
no edit summary
* Diogo Monteiro and Kieran Sedgwick, supervised by Andrew Smith.
* Our [[Seneca-CD-Timetables | timetables]].
= Blog =
* http://senecacd.wordpress.com/
* TODO-Andrew: set up a backup in case wordpress.com is not 100% reliable
 
= Bug Tracker =
 
* Waiting to hear back from Jordan about a stable Trac setup
* Maybe this will be it: http://rome.proximity.on.ca/projects/senecacd
 
= Plan for 2 weeks starting the 29th of October =
 
== Everyone ==
 
* Paperwork
 
== Diogo and Kieran ==
 
* Verify that the two desktops we start with are working and capable of supporting virtualization.
* Verify two of the network sockets work, and what the IP/subnet/DNS numbers to use are.
* Get setup on the project blog, start posting on it.
* Download and set up the latest CentOS, confirm kvm/libvirt/virt-manager work.
* Figure out what OpenNebula is capable of, how hard it is to set up, perhaps go through one setup.
* Read about iSCSI, check out OpenFiler, hopefully set it up, at least as a test if we don't yet have a dedicated box for the storage.
 
== Andrew ==
 
=== This week ===
* Arrange a visit to CloudDynamics for a tech demo.
* Discuss the idea of weekly short conference calls to make sure we're on the right track.
* Ask Peter about writing on the wall.
* Print the network diagram.
* Ask Dawn about moving the mac somewhere else.
* <s>Get more network cables.</s>
* <s>Talk to Diana about paperwork.</s>
 
=== Done ===
* <s>Get at least two more boxes (better 3).</s> On order due week of the 12th of Nov.
* <s>Talk to Jordan / Chris T. about Trac on monday or tuesday.</s>
* <s>Figure out the workspace network settings.</s>
* <s>Figure out whether a gigabit switch is necessary to support running VMs with the disk on another machine and figure out what it would cost.</s>
* <s>Obtain 8-port switch</s> and 8 cables. On order due week of the 12th of Nov.
* <s>Obtain a port-forwarding-capable NAT router.</s>
* <s>Meet with David G. about project plan.</s>
* <s>Ask about keys for cabinets</s>
 
=== Postponed ===
 
* Get a KVM switch supporting at least two inputs (3 or 4 even better).

Navigation menu