Difference between revisions of "Continuous Integration/proposal"

From CDOT Wiki
Jump to: navigation, search
Line 2: Line 2:
  
 
===Part 1 – Checking for new Change Sets on the Internal Repository===
 
===Part 1 – Checking for new Change Sets on the Internal Repository===
At a scheduled time, a process will run that will compare the current Revision ID of the External Repository to that in the Internal Repository. If there is a new revision/s in the Internal Repository, then these changes will be pulled to the Controller.
+
At a scheduled time, a process will run that will compare the current Revision ID of the External Repository to that in the Internal Repository. If there is a new revision/s in the Internal Repository, then these changes will be pulled to the Controller.<br/>
[[ Image: part1.jpg | 250px ]]<br/>
+
[[ Image: part1.jpg | 400px ]]<br/>

Revision as of 21:02, 8 April 2011

Automating The Synchronization of NexJ Server Express External Repository(Oct 6, 2010)

Part 1 – Checking for new Change Sets on the Internal Repository

At a scheduled time, a process will run that will compare the current Revision ID of the External Repository to that in the Internal Repository. If there is a new revision/s in the Internal Repository, then these changes will be pulled to the Controller.
Part1.jpg