Difference between revisions of "Team M Code Wranglers- oop344 20111"

From CDOT Wiki
Jump to: navigation, search
(Created page with '= Code Wranglers(team M)= == Project Marking Percentage == * due right after study break <big> Group work: XX% (25 <= xx <= 50) Individual work: XX% + (50 <= x…')
(No difference)

Revision as of 20:21, 28 March 2011

Code Wranglers(team M)

Project Marking Percentage

  • due right after study break

Group work:      XX%        (25 <= xx <= 50)
Individual work: XX% +      (50 <= xx <= 75) 
-------------------------
Total           100%

Repository

  • repo id: 16

Trunk Status

  • Committed at
    id: fardad
    name: fardad soleimanloo
    irc nick: fardad
  • Committed by
    id: Ronito Salamanca
    name: Ronito Salamanca
    irc nick: rsalamanca
  • Committed by
    id: [mailto: dbutcher@learn.senecac.on.ca Darren Butcher]
    name: Darren Butcher
    irc nick: hellodarren
  • Committed by
    id: Shavar Cox
    name: Shavar Cox
    irc nick: sscox

Team Members

Code Wranglers (team M)
First Name Last Name Section Seneca Id wiki id IRC nick Blog URL
Ronito Salamanca OOP344B rsalamanca rsalamanca rsalamanca Blog!

Tasks

Task 1

  • need input

Task Part 2

  • need input

Task Part 3

  • need input


Meetings (latest will be on top)

topic, date

date