Difference between revisions of "The Team OpText - OOP344"

From CDOT Wiki
Jump to: navigation, search
(oops, missed some)
(Issues)
 
(20 intermediate revisions by 5 users not shown)
Line 25: Line 25:
  
 
Programmer: Brendan McDorman Email:bmcdorman IRC:kuat
 
Programmer: Brendan McDorman Email:bmcdorman IRC:kuat
 +
 +
* 6 - bform.h,  bform.cpp code, due March 26, 2010
 +
 +
Programmer:  Carolyn Woodley Email: cwoodley1 IRC: cwoodley
 +
 +
* 7 - Compilation of project. Due March 19 midnight
 +
 +
Programmer: Mike Lin Email:mlin25 IRC:mlin25
 +
 +
* 8 - bfield.cpp code. Due March 27 midnight
 +
 +
Programmer: Bryan Cohen Email: bmcohen IRC: bmcohen
 +
 +
* 9 - BLabel.cpp code. Due March 27 midnight
 +
 +
Programmer: Brendan McDorman Email:bmcdorman IRC:kuat
 +
 +
* 10 - bedit.cpp code. Due March 27 midnight
 +
 +
Programmer: Mike Lin Email:mlin25 IRC:mlin25
 +
 +
* 11 - TxtEdit core.  Due March 28 midnight
 +
 +
Programmer: Umar Mirza Email: umirza  IRC: umirza85
 +
 +
* 12 - bfield.cpp testing. Due March 28 midnight
 +
 +
Programmer: David Seifried Email: dseifried IRC: Jangalang
 +
 +
* 13 - bform.cpp testing.  Due March 28 midnight
 +
 +
Programmer: Umar Mirza Email: umirza  IRC: umirza85
 +
 +
* 14 - blabel.cpp testing. Due March 28 midnight
 +
 +
Programmer:  Carolyn Woodley Email: cwoodley1 IRC: cwoodley
  
 
== Members ==
 
== Members ==
Line 42: Line 78:
  
 
====Tasks Progress====
 
====Tasks Progress====
 +
 +
-Task 3 completed <br />
 +
-Task 12 completed <br />
 +
-Fixed bedit.cpp as there were around 20 errors in it <br />
 +
-Fixed bfield.cpp as there were a few errors <br />
 +
-Applied all R 0.4 changes <br />
 +
-Coded BVedit.cpp, going to need someone to test it <br />
  
 
====Issues====
 
====Issues====
 +
 +
All changes made to files are in my branch
  
 
=== Carolyn Woodley  ===  
 
=== Carolyn Woodley  ===  
Line 51: Line 96:
 
Task 2 Completed
 
Task 2 Completed
 
* Skeleton for BForms
 
* Skeleton for BForms
 +
 +
Task 6 Completed... I think
 +
* BForm.cpp code filled in
 +
 +
Task 14 Completed.
 +
* BLabel.cpp code seems congruent to instructions, Awesome Job Brendan!
 +
 
====Issues====
 
====Issues====
  
Line 59: Line 111:
 
====Tasks Progress====
 
====Tasks Progress====
  
Task: Making bfield.h and a dummy bfield.cpp completed, awaiting testing.
+
 
 +
Task: Creating BLabel. Done, without testing yet.
  
 
====Issues====
 
====Issues====
  
I would prefer to use the main to test, so I'm awaiting that.
+
Bfield not completed for personal testing, but eh.
 
I cannot add the files to the vcproj, since I do not have visual studio, someone else must do that.
 
I cannot add the files to the vcproj, since I do not have visual studio, someone else must do that.
  
Line 70: Line 123:
  
 
====Tasks  Progress====
 
====Tasks  Progress====
 +
 +
- task 4 completed and committed to trunk.
  
 
====Issues====
 
====Issues====
Line 78: Line 133:
  
 
====Tasks  Progress====
 
====Tasks  Progress====
 +
 +
Task 7 Completed.<br/>
 +
Task 10 Completed.
  
 
====Issues====
 
====Issues====

Latest revision as of 01:24, 30 March 2010


OOP344 | Weekly Schedule | Student List | Teams | Project | Student Resources

The Applicaton

Repo No: 6

Issues

Tasks

  • 1- Branch the trunk into biof0.8 in tags and create a workspace to work on biof functions due Mar 16 midnight;

Programmer: Umar Mirza Email: umirza IRC: umirza85

  • 2 - bform.h, bform.cpp mockup, returning dummy values, due March 17 midnight

Programmer: Carolyn Woodley Email: cwoodley1 IRC: cwoodley

  • 3 - bedit.h, bedit.cpp mockup, returning dummy values due Mar 18 midnight

Programmer: David Seifried Email: dseifried IRC: Jangalang

  • 4 - blabel.h, blabel.cpp mockup, returning dummy values Due Mar 18 midnight

Programmer: Bryan Cohen Email: bmcohen IRC: bmcohen

  • 5 - bfield.h, bfield.cpp mockup, returning dummy values Due March 17 midnight

Programmer: Brendan McDorman Email:bmcdorman IRC:kuat

  • 6 - bform.h, bform.cpp code, due March 26, 2010

Programmer: Carolyn Woodley Email: cwoodley1 IRC: cwoodley

  • 7 - Compilation of project. Due March 19 midnight

Programmer: Mike Lin Email:mlin25 IRC:mlin25

  • 8 - bfield.cpp code. Due March 27 midnight

Programmer: Bryan Cohen Email: bmcohen IRC: bmcohen

  • 9 - BLabel.cpp code. Due March 27 midnight

Programmer: Brendan McDorman Email:bmcdorman IRC:kuat

  • 10 - bedit.cpp code. Due March 27 midnight

Programmer: Mike Lin Email:mlin25 IRC:mlin25

  • 11 - TxtEdit core. Due March 28 midnight

Programmer: Umar Mirza Email: umirza IRC: umirza85

  • 12 - bfield.cpp testing. Due March 28 midnight

Programmer: David Seifried Email: dseifried IRC: Jangalang

  • 13 - bform.cpp testing. Due March 28 midnight

Programmer: Umar Mirza Email: umirza IRC: umirza85

  • 14 - blabel.cpp testing. Due March 28 midnight

Programmer: Carolyn Woodley Email: cwoodley1 IRC: cwoodley

Members

Umar Mirza

Email: umirza IRC: umirza85

Tasks Progress

- Task 1 Completed
- Completed the main that can be compiled conditionally.

Issues

David Seifried

Email: dseifried IRC: Jangalang

Tasks Progress

-Task 3 completed
-Task 12 completed
-Fixed bedit.cpp as there were around 20 errors in it
-Fixed bfield.cpp as there were a few errors
-Applied all R 0.4 changes
-Coded BVedit.cpp, going to need someone to test it

Issues

All changes made to files are in my branch

Carolyn Woodley

Email: cwoodley1 IRC: cwoodley

Tasks Progress

Task 2 Completed

  • Skeleton for BForms

Task 6 Completed... I think

  • BForm.cpp code filled in

Task 14 Completed.

  • BLabel.cpp code seems congruent to instructions, Awesome Job Brendan!

Issues

Brendan McDorman

Email: bmcdorman IRC: Kuat


Tasks Progress

Task: Creating BLabel. Done, without testing yet.

Issues

Bfield not completed for personal testing, but eh. I cannot add the files to the vcproj, since I do not have visual studio, someone else must do that.

Bryan Cohen

Email: bmcohen IRC: bmcohen

Tasks Progress

- task 4 completed and committed to trunk.

Issues

Michael Lin

Email: mlin25 IRC: mlin25

Tasks Progress

Task 7 Completed.
Task 10 Completed.

Issues