Difference between revisions of "Summer 2015 OSTEP Team Training"

From CDOT Wiki
Jump to: navigation, search
(Initial Tasks)
(Equipment Needs)
 
(2 intermediate revisions by the same user not shown)
Line 94: Line 94:
 
== Next Tasks ==
 
== Next Tasks ==
  
* Do complete bb1 buildthrough to el7
 
 
* Get GUI working
 
* Get GUI working
 
* Get interactive installer working
 
* Get interactive installer working
* Set up Sigul
 
  
 
== To Discuss ==
 
== To Discuss ==
Line 105: Line 103:
  
 
== Equipment Needs ==
 
== Equipment Needs ==
* Workstations
+
 
** Have 4 RA PCs
+
* LEAP Team
** Need 7 RA PCs (+3)
+
** 1 chair w/ adjustable arm height
*** Take 1 from BRAKERS
+
** 2 pairs of LCD monitors
*** Use machine confiscated by CSO
+
** 1 PC
*** +1?
+
** 1 Extension cord set
* Space and furniture
+
** 1 PSU 600W+
** Need 2 furnished cubicles (DevOps)
+
** Name sign & keys - Michael, Reinildo, Artem
** Need 1 task chair for (Artem)
+
** Need contracts - everyone!

Latest revision as of 12:43, 6 May 2015

May 4

CDOT Orientation

  • 10 AM - 2 PM including Lunch

DevOps

  • Relocate to new location
    • NE cubicle in T1034 cubicle cluster + Table
      • Coin toss for table!
      • Edwin: ?? - Existing PC
      • Justin: ?? - Import PC
  • Discussion of Summer 2015 Project
    • Overview
    • Initial projects: Infrastructure setup, server selection
  • Schedule for the Week

LEAP

  • Workspace setup
    • LEAP: 4 cubicles in T1036 cubicle cluster + Table
      • Andrew: SW - Existing PC
      • Glaser: NE - Existing PC
      • Artem: Table - Import PC
      • Reinaldo: (SE Import/NW Existing)
      • Michael: (SE Import/NW Existing)
  • Computer setup
    • Individual workstations
    • Clean-up of storage and security on existing workstations
    • SSH key generation for EHL
  • Schedule for the Week

Tuesday, May 5

LEAP Intensive Training

  • 9-12 - T1042
    • RPM Overview
    • Creating an RPM Package
  • 2-5 - T1030
    • Working with Mock
    • Working with Koji
    • Package Set Dependencies

DevOps Training

  • 12:30-2:00 - T1030
    • Project Overview
    • Preparation
      • Initial research directions
      • VM setup and configuration
    • On-site training/requirements gathering

Wednesday, May 6

LEAP Intensive Training

  • Building, Releasing, and Maintaing a Distribution
    • Signing
    • Repos
    • Repoclosure
    • Composing
    • Release Notes
  • Boot process
    • Anaconda
    • Kickstart
    • PXE
    • uEFI
    • Installation configuration
  • Using the EHL
    • Architecture
    • VPN
    • Gateway system
    • System control - power, monitoring

Initial Tasks

  • X-Gene PCIe tests - Artem
    • Test new firmware for X-Gene
    • ACPI tests
    • PCIe SATA (AHA 71605H)
  • Test LEAP installation process - Reinildo
    • Package set defaults
    • Comps (groups)
  • Set up S1 - Michael
    • Test w/ LEAP
  • Rewire and label EHL - Artem
    • Plan
    • Implement w/ minimal impact on operations
    • Set up Red as the gateway for the EHL
  • Sigul setup - Glaser
  • Test LEAP operation in a variety of contexts
  • Investigate 10G performance on X-Gene
  • Build BB1 (LEAP 7.1)
    • Current status
    • Build forward

Next Tasks

  • Get GUI working
  • Get interactive installer working

To Discuss

  • Pidora
  • Flock 2015

Equipment Needs

  • LEAP Team
    • 1 chair w/ adjustable arm height
    • 2 pairs of LCD monitors
    • 1 PC
    • 1 Extension cord set
    • 1 PSU 600W+
    • Name sign & keys - Michael, Reinildo, Artem
    • Need contracts - everyone!