Difference between revisions of "Summer 2015 OSTEP Team Training"
Chris Tyler (talk | contribs) (→DevOps) |
Chris Tyler (talk | contribs) (→May 4) |
||
Line 6: | Line 6: | ||
=== DevOps === | === DevOps === | ||
* Relocate to new location | * Relocate to new location | ||
− | ** | + | ** NE cubicle in T1034 cubicle cluster + Table |
*** Coin toss for table! | *** Coin toss for table! | ||
*** Edwin: ?? - Existing PC | *** Edwin: ?? - Existing PC | ||
*** Justin: ?? - Import PC | *** Justin: ?? - Import PC | ||
+ | * Discussion of Summer 2015 Project | ||
+ | ** Overview | ||
+ | ** Initial projects: Infrastructure setup, server selection | ||
+ | |||
+ | === LEAP === | ||
+ | * Workspace setup | ||
** LEAP: 4 cubicles in T1036 cubicle cluster + Table | ** LEAP: 4 cubicles in T1036 cubicle cluster + Table | ||
*** Andrew: SW - Existing PC | *** Andrew: SW - Existing PC | ||
Line 16: | Line 22: | ||
*** Reinaldo: (SE Import/NW Existing) | *** Reinaldo: (SE Import/NW Existing) | ||
*** Michael: (SE Import/NW Existing) | *** Michael: (SE Import/NW Existing) | ||
− | |||
− | |||
− | |||
− | |||
* Computer setup | * Computer setup | ||
+ | ** Individual workstations | ||
+ | ** Clean-up of storage and security on existing workstations | ||
+ | ** SSH key generation for EHL | ||
== Tuesday, May 5 == | == Tuesday, May 5 == |
Revision as of 09:34, 3 May 2015
Contents
May 4
CDOT Orientation
- 10 AM - 2 PM including Lunch
DevOps
- Relocate to new location
- NE cubicle in T1034 cubicle cluster + Table
- Coin toss for table!
- Edwin: ?? - Existing PC
- Justin: ?? - Import PC
- NE cubicle in T1034 cubicle cluster + Table
- Discussion of Summer 2015 Project
- Overview
- Initial projects: Infrastructure setup, server selection
LEAP
- Workspace setup
- LEAP: 4 cubicles in T1036 cubicle cluster + Table
- Andrew: SW - Existing PC
- Glaser: NE - Existing PC
- Artem: Table - Import PC
- Reinaldo: (SE Import/NW Existing)
- Michael: (SE Import/NW Existing)
- LEAP: 4 cubicles in T1036 cubicle cluster + Table
- Computer setup
- Individual workstations
- Clean-up of storage and security on existing workstations
- SSH key generation for EHL
Tuesday, May 5
LEAP Intensive Training
- RPM Overview
- Creating an RPM Package
- Working with Mock
- Working with Koji
- Package Set Dependencies
Wednesday, May 6
LEAP Intensive Training
- Building, Releasing, and Maintaing a Distribution
- Signing
- Repos
- Repoclosure
- Composing
- Release Notes
- Boot process
- Anaconda
- Kickstart
- PXE
- uEFI
- Installation configuration
- Using the EHL
- Architecture
- VPN
- Gateway system
- System control - power, monitoring
Initial Tasks
- Test new firmware for X-Gene
- Test LEAP installation process
- Test LEAP operation in a variety of contexts
- Test device support in LEAP
- Investigate 10G performance on X-Gene
- Set up Seattle (try LEAP on it?)
- Set up a Seattle as the gateway for the EHL
- Check repoclosure on aa2 and bb1 builds
Next Tasks
- Do complete bb1 buildthrough to el7
- Get GUI working
- Get interactive installer working
- Set up Sigul
To Discuss
- Pidora
- Flock 2015
Equipment Needs
- Workstations
- Have 4 RA PCs
- Need 7 RA PCs (+3)
- Take 1 from BRAKERS
- Use machine confiscated by CSO
- +1?
- Space and furniture
- Need 2 furnished cubicles (DevOps)
- Need 1 task chair for (Artem)