Difference between revisions of "Summer 2015 OSTEP Team Training"
Chris Tyler (talk | contribs) |
Chris Tyler (talk | contribs) |
||
Line 64: | Line 64: | ||
* Pidora | * Pidora | ||
* Flock 2015 | * Flock 2015 | ||
+ | |||
+ | == Equipment Needs == | ||
+ | * Workstations | ||
+ | ** Have 4 RA PCs | ||
+ | ** Need 7 RA PCs (+3) | ||
+ | *** Take 1 from BRAKERS | ||
+ | *** Use machine confiscated by CSO | ||
+ | *** +1? | ||
+ | * Space and furniture | ||
+ | ** Need 2 furnished cubicles (DevOps) | ||
+ | ** Need 1 task chair for (Artem) |
Revision as of 21:49, 28 April 2015
Contents
May 4
CDOT Orientation
- 10 AM - 2 PM including Lunch
DevOps
- Relocate to new location
- Discussion of Summer 2015 Project
LEAP
- Workspace setup
- Computer setup
Tuesday, May 5
LEAP Intensive Training
- RPM Overview
- Creating an RPM Package
- Working with Mock
- Working with Koji
- Package Set Dependencies
Wednesday, May 6
LEAP Intensive Training
- Building, Releasing, and Maintaing a Distribution
- Signing
- Repos
- Repoclosure
- Composing
- Release Notes
- Boot process
- Anaconda
- Kickstart
- PXE
- uEFI
- Installation configuration
- Using the EHL
- Architecture
- VPN
- Gateway system
- System control - power, monitoring
Initial Tasks
- Test new firmware for X-Gene
- Test LEAP installation process
- Test LEAP operation in a variety of contexts
- Test device support in LEAP
- Investigate 10G performance on X-Gene
- Set up Seattle (try LEAP on it?)
- Set up a Seattle as the gateway for the EHL
- Check repoclosure on aa2 and bb1 builds
Next Tasks
- Do complete bb1 buildthrough to el7
- Get GUI working
- Get interactive installer working
- Set up Sigul
To Discuss
- Pidora
- Flock 2015
Equipment Needs
- Workstations
- Have 4 RA PCs
- Need 7 RA PCs (+3)
- Take 1 from BRAKERS
- Use machine confiscated by CSO
- +1?
- Space and furniture
- Need 2 furnished cubicles (DevOps)
- Need 1 task chair for (Artem)