(Created page with '== May 4 == === CDOT Orientation === * 10 AM - 2 PM including Lunch === OSTEP-DevOps === * Relocate to new location * Discussion of Summer 2015 Project === LEAF === * Workspac…')
 
Line 40: Line 40:
 
** Gateway system
 
** Gateway system
 
** System control - power, monitoring
 
** System control - power, monitoring
 +
 +
== Initial Tasks ==
 +
 +
* Test new firmware for X-Gene
 +
* Test LEAP installation process
 +
* Test LEAP operation in a variety of contexts
 +
* Test device support in LEAP
 +
* Investigate 10G performance on X-Gene
 +
* Set up Seattle (try LEAP on it?)
 +
* Set up a Seattle as the gateway for the EHL
 +
* Check repoclosure on aa2 and bb1 builds
 +
 +
== Next Tasks ==
 +
 +
* Do complete bb1 buildthrough to el7
 +
* Get GUI working
 +
* Get interactive installer working
 +
* Set up Sigul
 +
 +
== To Discuss ==
 +
 +
* Pidora
 +
* Flock 2015

Revision as of 17:47, 27 April 2015

May 4

CDOT Orientation

  • 10 AM - 2 PM including Lunch

OSTEP-DevOps

  • Relocate to new location
  • Discussion of Summer 2015 Project

LEAF

  • Workspace setup
  • Computer setup

Tuesday, May 5

LEAF Intensive Training

  • RPM Overview
  • Creating an RPM Package
  • Working with Mock
  • Working with Koji
  • Package Set Dependencies

Wednesday, May 6

LEAF Intensive Training

  • Building, Releasing, and Maintaing a Distribution
    • Signing
    • Repos
    • Repoclosure
    • Composing
    • Release Notes
  • Boot process
    • Anaconda
    • Kickstart
    • PXE
    • Installation configuration
  • Using the EHL
    • Architecture
    • VPN
    • Gateway system
    • System control - power, monitoring

Initial Tasks

  • Test new firmware for X-Gene
  • Test LEAP installation process
  • Test LEAP operation in a variety of contexts
  • Test device support in LEAP
  • Investigate 10G performance on X-Gene
  • Set up Seattle (try LEAP on it?)
  • Set up a Seattle as the gateway for the EHL
  • Check repoclosure on aa2 and bb1 builds

Next Tasks

  • Do complete bb1 buildthrough to el7
  • Get GUI working
  • Get interactive installer working
  • Set up Sigul

To Discuss

  • Pidora