Difference between revisions of "Team R - OOP344 20133"

From CDOT Wiki
Jump to: navigation, search
(NOTES)
(tasks)
 
(16 intermediate revisions by 3 users not shown)
Line 11: Line 11:
  
 
== Repository ==
 
== Repository ==
* repo path:
+
* repo path: [https://github.com/Seneca-OOP344/Team-R Team R's Repo]
 
=== Master Branch Status ===
 
=== Master Branch Status ===
 
====Status====
 
====Status====
*'''''Open/Closed'''''
+
*'''''Open'''''
 
*: Open: you can merge now.
 
*: Open: you can merge now.
 
*: Closed: Wait for the repo to get opened
 
*: Closed: Wait for the repo to get opened
Line 21: Line 21:
  
 
== Coding Style and Standards ==
 
== Coding Style and Standards ==
* No Tab Character allowed. (replace tabs with spaces)
+
* '''No Tab Character''' allowed. (replace tabs with spaces)
 +
* Tab Size = 3 spaces (To reformat tabs into spaces change VS settings and press ctrl+k+d)
 
* Each object must have its own type:
 
* Each object must have its own type:
 
<big><syntaxhighlight lang="cpp">
 
<big><syntaxhighlight lang="cpp">
Line 28: Line 29:
 
CDialog D;
 
CDialog D;
 
</syntaxhighlight></big>
 
</syntaxhighlight></big>
*Tab Size = 3 spaces
+
 
 +
== Repository ==
 +
* repo Github id:https://github.com/Seneca-OOP344/Team-R
  
 
== Team Members ==
 
== Team Members ==
Line 44: Line 47:
 
|[[User:Shane Narciso | Shane ]]|| Narciso || C || [mailto:sanarciso@myseneca.ca?subject=oop344 sanarciso ] ||[[Special:Contributions/Shane Narciso | Shane Narciso]] || thatdude22 || [http://thatdude22.wordpress.com/ Shane's Blog]
 
|[[User:Shane Narciso | Shane ]]|| Narciso || C || [mailto:sanarciso@myseneca.ca?subject=oop344 sanarciso ] ||[[Special:Contributions/Shane Narciso | Shane Narciso]] || thatdude22 || [http://thatdude22.wordpress.com/ Shane's Blog]
 
|-
 
|-
 
  
 
<!--
 
<!--
Line 51: Line 53:
 
-->
 
-->
 
|}
 
|}
 +
 
== Useful Blogposts ==
 
== Useful Blogposts ==
 
[http://zachdhoward.wordpress.com/2013/10/18/my-github-flow/ My GitFlow]
 
[http://zachdhoward.wordpress.com/2013/10/18/my-github-flow/ My GitFlow]
 +
 +
== meetings ==
 +
* latest will be on top
 +
* Tuesday November 5 @ 12:00pm in Library - Debugging, and finalization of R0.3
 +
* Friday October 18 @ 1:30 in Library - Discuss R0.3
 +
 
== tasks ==
 
== tasks ==
=== R0.3 ===
+
<i>Mandatory: Application</i>
 +
# <u>'''Browse Record'''</u>
 +
#* Members: Kunpriya aggarwal
 +
#* Task: Code browse record functionality
 +
#* Files in <span style="color:black;font-weight:900">Kunpriya-V1--Application</span> branch of Team R Repository
 +
#* Status: <span style="color:black;font-weight:900">Done</span><br/>
 +
<b>Note: </b>I used all files from previous releases and object files of CDilog and CLabel.
 +
 
 +
<br /><br />'''Release 0.3'''
 
* Prototyping - Zach
 
* Prototyping - Zach
 
* CLabel - Zach
 
* CLabel - Zach
Line 68: Line 85:
 
* Daniel and Kunpriya finished CDialog together.
 
* Daniel and Kunpriya finished CDialog together.
 
* CDialog was completed at one time by 2 people.
 
* CDialog was completed at one time by 2 people.
* Somebody Overwrote the CLineedit in master. Trying to return to my version
+
* Somebody Overwrote the CLineedit in master. Trying to return to my version (Shane)
  
== meetings ==
+
 
* latest will be on top
+
=== R0.4 ===
* Tuesday November 5 @ 12:00pm in Library - Debugging, and finalization of R0.3
+
* R.0.4.1 - CButton - Daniel
* Friday October 18 @ 1:30 in Library - Discuss R0.3
+
* R.0.4.2 - CValEdit - Zach
=== topic, date ===
+
* R.0.4.3 - CCheckMark - Shane A. N.
[[Irc logs of meeting (unique name) - oop344 20113 | date]]
+
* R.0.4.4 - CMenuItem - Kunpriya Aggarwal
 +
 
 +
=== NOTES ===
 +
 
 +
*Prototyping can be done individually
 +
*CCheckMark Prototyping Completed 11/13/13 - Shane
 +
*CMenuItem Prototyping: '''Completed''' - Kunpriya Aggarwal
 +
*CCheckMark testing Completed 11/21/13 - Shane

Latest revision as of 14:09, 14 December 2013


OOP344 | Weekly Schedule | Student List | Teams | Project | Student Resources

Team R

Project Marking Percentage

  • due immediately

Group work:      50%        (25 <= xx <= 50)
Individual work: 50% +      (50 <= xx <= 75)
-------------------------
Total           100%

Repository

Master Branch Status

Status

  • Open
    Open: you can merge now.
    Closed: Wait for the repo to get opened

Logs

  • DateTime, Merged/being Merged by full name, ircnick: mynick, any other info

Coding Style and Standards

  • No Tab Character allowed. (replace tabs with spaces)
  • Tab Size = 3 spaces (To reformat tabs into spaces change VS settings and press ctrl+k+d)
  • Each object must have its own type:
int a;
int b;
CDialog D;

Repository

Team Members

Team R
First Name Last Name Section Seneca Id wiki id IRC nick -
Zach Howard B zdhoward Zach Howard zdhoward Zach's Blog
Kunpriya Aggarwal B kaggarwal3 Kunpriya Aggarwal kiara3 Kunpriya's Blog
Daniel Dvorkin B dldvorkin Daniel Dvorkin dvorkin212 Dldvorkin' Blog
Shane Narciso C sanarciso Shane Narciso thatdude22 Shane's Blog

Useful Blogposts

My GitFlow

meetings

  • latest will be on top
  • Tuesday November 5 @ 12:00pm in Library - Debugging, and finalization of R0.3
  • Friday October 18 @ 1:30 in Library - Discuss R0.3

tasks

Mandatory: Application

  1. Browse Record
    • Members: Kunpriya aggarwal
    • Task: Code browse record functionality
    • Files in Kunpriya-V1--Application branch of Team R Repository
    • Status: Done

Note: I used all files from previous releases and object files of CDilog and CLabel.



Release 0.3

  • Prototyping - Zach
  • CLabel - Zach
  • CLineEdit - Shane A. N.
  • CDialog - Kunpriya and Daniel

PROBLEM WITH MAKING CDIALOG OBJECTS

  • In R.03_CDialog_fix ... try to fix the problem in CDialog

NOTES

  • Zach finished CLabel along with the prototyping.
  • Shane finished CLineEdit.
  • Daniel and Kunpriya finished CDialog together.
  • CDialog was completed at one time by 2 people.
  • Somebody Overwrote the CLineedit in master. Trying to return to my version (Shane)


R0.4

  • R.0.4.1 - CButton - Daniel
  • R.0.4.2 - CValEdit - Zach
  • R.0.4.3 - CCheckMark - Shane A. N.
  • R.0.4.4 - CMenuItem - Kunpriya Aggarwal

NOTES

  • Prototyping can be done individually
  • CCheckMark Prototyping Completed 11/13/13 - Shane
  • CMenuItem Prototyping: Completed - Kunpriya Aggarwal
  • CCheckMark testing Completed 11/21/13 - Shane