Changes

Jump to: navigation, search

BTP300B A2 Team 5 Work Plan

859 bytes added, 18:39, 14 November 2013
no edit summary
'''[[BTP300B A2 Teams Fall 2013|<-- Go Back]] <u>A2 Revision 2</u> Shirwa Egal(Team Leader)''' *CField Ari Keleshian*CButton Jan*CLabel Kabeer Rashid*CLine
Team Effort
*Main component
*CDialog
<u>A2 Revision 1</u>
 
'''Shirwa Egal(Team Leader)'''
* Coding the following methods:
** void setLine() const
** void capture()
** edit()
** display()
** draw()
** both col()methods
'''Ari Keleshian'''
* Coding the following methods:
** absrow()
** abscol()
** goMiddle()
** void bordered(bool)
** bool bordered()
'''Jan'''
*Coding the following methods:
** Cframe* frame() const
** void frame(CFrame*)
** both row()methods
** hide()
 
'''KabeerRashid'''*Initial creation of various files required for getting started on the project iframe.h, cfg.h, cframe.h and cframe.cpp,etc** Followed by coding these methods:*** Both height() Functions*** Both width() Functions*** move()*** move() the helper function** constructor and destructor

Navigation menu