Difference between revisions of "BTP300B A2 Team 3 Work Plan"
Line 3: | Line 3: | ||
<u>'''Part 2'''</u> | <u>'''Part 2'''</u> | ||
+ | |||
'''Alek Minassian (Team Leader)''' | '''Alek Minassian (Team Leader)''' | ||
Line 23: | Line 24: | ||
<u>'''Part 1'''</u> | <u>'''Part 1'''</u> | ||
+ | |||
'''Alek Minassian (Team Leader)''' | '''Alek Minassian (Team Leader)''' |
Revision as of 15:15, 10 November 2013
Part 2
Alek Minassian (Team Leader)
- CField
- CDialog
Anson Tan
- CLabel
Justin Flowers
- CLine
Team Effort
- CButton
- The team will work on creating the application
Part 1
Alek Minassian (Team Leader)
- Initial creation of the various files required for getting started on the project: iframe.h, cfg.h, cframe.h/cpp, etc.
- Create build scripts for each of Microsoft, Borland, and Linux.
- Implement the following methods:
- constructor and destructor
- setLine()
- capture()
- display()
- edit()
- draw()
Anson Tan
- Implement the following methods:
- absrow()
- abscol()
- goMiddle()
- the two bordered() methods
- the two frame() methods
- hide()
Justin Flowers
- Implement the following methods:
- the two row() methods
- the two col() methods
- the two height() methods
- the two width() methods
- move()
- move() (helper function)
Team Effort
- The team will work on creating the application