Difference between revisions of "Team C - OOP344 20133"
(→Team Members) |
(→CODE ROCKERS) |
||
Line 3: | Line 3: | ||
* due right after study break | * due right after study break | ||
<big> | <big> | ||
− | Group work: | + | Group work: 50% (25 <= xx <= 50) |
− | Individual work: | + | Individual work: 50% + (50 <= xx <= 75) |
------------------------- | ------------------------- | ||
Total 100% | Total 100% |
Revision as of 19:47, 20 October 2013
Contents
CODE ROCKERS
Project Marking Percentage
- due right after study break
Group work: 50% (25 <= xx <= 50) Individual work: 50% + (50 <= xx <= 75)
Total 100%
Repository
- repo path:https://github.com/Seneca-OOP344/Team-C
Master Branch Status
Status
- Open/Closed
- Open: you can merge now.
- Closed: Wait for the repo to get opened
Logs
- DateTime, Merged/being Merged by full name, pthakur1: pthakur1
Coding Style and Standards
- No Tab Character allowed. (replace tabs with spaces)
- Each object must have its own type:
int a;
int b;
CDialog D;
Team Members
First Name | Last Name | Section | Seneca Id | wiki id | IRC nick | Blog URL |
---|---|---|---|---|---|---|
Harshwinder | Singh | C | Harshwinder Singh | Harshwinder Singh | harsh1 | [1] |
Puneet | Thakur | C | pthakur1 | Puneet Thakur | pthakur1 | [2] |
tasks
task name
- task description
- being done by team member name / not assigned
- status
meetings
- latest will be on top